My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-137A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-137A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:13:00 AM
Creation date
9/30/2015 10:44:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-137A
Agenda Item Number
11.C.1
Entity Name
Turner Construction
Subject
Change Order COR-091 County Administration Building
Area
1801 27th Street Administration Building
Supplemental fields
SmeadsoftID
6266
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 ' 20i12007 TUE 18 : 18 FAT 561 6888178 Q1_'A\iUfil ,44 C2813 Tu[s E� X006 / 009 <br /> Profeta!- IR4C O SCORe-& <br /> Turns✓ Change Orderf'ioposa/ �4r�D7 <br /> CcDff2f <br /> Sheetmetal <br /> L <br /> al: Material oey Units - Unit Total o-; Unl[ Field <br /> st Estimate Cost Materiai Fleld Labor <br /> ricated Duct and Fraii ngs A los $1 .95 $0.00 0.001 <br /> ews and Hardware 8"u.GO 0.00 <br /> OM <br /> port Stssl $0.010- OM <br /> 30.00 <br /> 0.00 <br /> Ductaccess doors_ 5 $45.00 $225.00 _ _ 0,00 <br /> ins�lI dampers 1 $C.00 32:0.", 3200 <br /> mia< materials 1 8750.OG $150.00 O.GO <br /> 30.GO O.CO� <br /> 0-0,00 <br /> 00 <br /> SOM$0.00 MOO$0.00 SO.W <br /> _ $0,00 _ 0.00 <br /> $0.00 0.00 <br /> 50.00 0.0 <br /> �{ $0.00 _ _ 0.0 <br /> $O,CO 0.0 <br /> Elevated Work (Height of Installation) 15 't $0.00 �._. 0% 0. <br /> Material Handling (10% of Labcr $0.00 0. <br /> Multisto Building (1 % per Floor) Flows $0.00 0% 110.0 <br /> Cleanup (8 r,rsrwk pe, mew of 5) $0.00 0.0 <br /> OvOrtime Requirements (%1 0% _ $0.000.0 <br /> Sheetmet2l Foreman (20Y of Labor) $0.00 l _ 6.4 <br /> Material Take Off (25% of IahC, ) $0.00 ODO <br /> Material Ordering (25% of Labor) _ $0,00 0.00 <br /> Msasuremem '2FI% <br /> 5% of Labor) 's0.G0 _ 0.00 <br /> eator) $000Safe _Suht $375.00 3840 <br /> __� $375.00 38.40 <br /> e.:2 tJ e41 mc,aima dan+xi: :1I.YI; <br />
The URL can be used to link to this page
Your browser does not support the video tag.