My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:27:56 AM
Creation date
9/30/2015 11:02:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/20/2007
Control Number
2007-263A
Agenda Item Number
county administer signature
Entity Name
Turner Construction Donadio & Associates
Subject
Punch List Building 1 - 1st Floor - East Half
Supplemental fields
SmeadsoftID
6489
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 1st Floor Punchlist - Friday 04/20/07 <br /> May 07, 2007 <br /> Page 20 <br /> Office 334 <br /> 1 . Perimeter of the middle window light frame the finish on the door appears to be damaged in someway, needs <br /> to clean it and see if it comes off. <br /> 2. Carpet, vinyl base and ceiling installed. <br /> 3 . Furniture in boxes sitting in the middle of the room <br /> 4. Hollow metal frame needs to be touched up with paint on both sides of the door frame and also, carpet <br /> adhesive needs to be removed. <br /> 5. Top right of hollow metal door frame where it abuts the drywall needs to be patched and repaired. Ben in the <br /> drywall frame is very visible and also, top left overspray on the door frame. <br /> 6. Clean out in the exterior wall the Northeast comer, left comer needs a cover plate installed. <br /> 7. North wall below Data Outlet 41D & 42D drywall needs to be sanded and repainted. <br /> 8. Left inside corner to the left of the exterior window needs to be painted. Also, below that window and the <br /> exterior wall on this left corner, screw heads showing needs to be patched and repaired above the vinyl base. <br /> Office Area 335 <br /> 1 . Carpet, vinyl base and ceiling installed. <br /> 2. Furniture in place in boxes in the room. <br /> 3. Door 335 the finish appears to be damaged around the view light frame. <br /> 4. to the left of hollow metal door frame drywall needs to be sanded and repainted flush . <br /> 5 . Hollow metal door frame 335 damaged on the right side, hinge side. Also, carpet adhesive needs to be <br /> removed. <br /> 6. No switch cover plates installed . <br /> 7 . East wall exterior window glazing stop inside corner is too short. <br /> 8 . Southwest wall far left electrical outlet drywall needs to be sanded and repainted around the outlet and also <br /> below the outlet drywall is irregular needs to be patched and repaired. <br /> Open Office Area 336 & 337 <br /> 1 . Office furniture is in place leaning up against the wall especially the North wall . <br /> 2. Carpet, vinyl base and ceiling tile in place. <br /> 3 . East wall between Door 333 and 334, furniture leaning up against the wall. <br /> 4. About the middle of the wall 2ft. off the floor, dent in the drywall and painted over, this needs to be patched <br /> and repaired. <br /> 5 . East wall at Office 335 at Open Office Area 337, covered with furniture unable to inspect properly. <br /> 6. East wall Southeast cornet that is the wall adjacent to Office 335, gouge in the drywall above the vinyl base to <br /> the right of the duplex outlet. Needs to be patched and repaired. <br /> 7 . South wall Easternmost exterior window, hole in the drywall below the window needs to be patched and <br /> repaired. <br /> 8 . South wall Open Office Area 337 to the left of the Easternmost double window, bulge in the drywall needs to <br /> be corrected . Vinyl base not fitting flush to the wall. <br /> 9. Data outlets 37 & 38D needs to be fixed, data plug is pushed into the outlet cover. <br /> 10. South wall, Southwest corner to the right of the double window inside comer needs to be sanded and <br /> repainted. <br /> 11 . West wall needs to be cleaned of carpet glue. <br /> 12. Drywall to the left of Door frame 339A drywall needs to be sanded and repainted. Also, door frame on the <br /> outside needs carpet glue removed and frame repainted. <br /> 13 . To the right of Door frame 339 approximately 3ft. up , irregularity in the drywall needs to be sanded and <br /> repainted. <br /> 14. Door frame 340A bottom left and right needs to be repainted and cleaned of carpet adhesive. Also, to the left <br /> needs to be repainted, paint is irregular and frame is bent. <br /> 15 . Bottom left of Door 340A and bottom right, drywall needs to be sanded and repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A . <br />
The URL can be used to link to this page
Your browser does not support the video tag.