Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 — 1st Floor Punchlist — Friday 04/20/07 <br /> May 07, 2007 <br /> Page 22 <br /> Office 341 <br /> 1 . Door frame 341 scratches needs to be touched up with paint at the exterior edges and cleaned of carpet <br /> adhesive. <br /> 2. Carpet, vinyl base and ceiling file installed. <br /> 3 . Outside hollow metal door frame 341 top and right comers needs to be sanded, overspray of paint. <br /> 4. Outside face right side adjacent to the metal hinge door is scratched. <br /> 5. Drywall to the right of Door 341 and also to the right between the two duplex outlets imperfections in the <br /> drywall needs to be sanded and repainted. <br /> 6. Drywall around the duplex electrical outlet on the exterior wall needs to be sanded and repainted. <br /> 7. West wall to the right of the Northernmost electrical outlet on the North end/ Right end drywall needs to be <br /> repainted above the vinyl base. <br /> 8 . West wall above the electrical outlet fingerprints and dirt on the wall needs to be cleaned. <br /> Open Office Area 343 <br /> 1 . Drywall, vinyl base and ceiling file in place. <br /> 2. Office furniture leaning up against the walls throughout this area. <br /> 3 . Right and left outside comer leading into this area need to be touched up with paint on the drywall. <br /> 4. Vinyl base is scuffed at the outside edges leading into this space. <br /> 5 . North wall about the middle of the wall above the vinyl base approximately 12 inches, imperfections on the <br /> drywall needs to be sanded and repainted. Also, the drywall around the electrical outlet on this same wall <br /> needs to be sanded and repainted, irregular. <br /> GENERAL NOTES: <br /> 1 . At this time furniture is being moved into the ls` Floor East end of Building 1 . This was not supposed to be <br /> moved in until Monday April 23rd. <br /> 2 . All cabinetry needs to be adjusted so that the doors and drawers are plumb and level to each other and spaced <br /> properly. <br /> 3. No door hardware is installed at this time on the ls` Floor East. <br /> 4. All metal window frames for door lights where the frame abuts the glass is very irregular, paint on the glass, <br /> etc . This needs to be cleaned. <br /> 5. All light fixtures are still covered with plastic wrap. <br /> 6. All cabinetry needs to be cleaned of dirt and debris inside and out. <br /> 7. All electrical outlets, outlet cover plates need to be cleaned of dirt, debris and paint. <br /> 8 . Window frames and window sills on this portion of the Building needs to be cleaned of all drywall mud, dirt <br /> and debris . <br /> 9 . All area where carpet is cut into the door frames needs to be re-looked at. Carpet cut too short, not adhering <br /> properly, appears in numerous locations. <br /> 10. All interior pre-finished doors need to be cleaned of paint overspray, paint and at the metal frame for view <br /> lights need to be cleaned where the view light and metal frame meet the glass. Need to make sure that the <br /> glass is cleaned of all the paint. There are numerous imperfections in the frame that need to be sanded and <br /> repainted. <br /> 11 . All vinyl file where it abuts the hollow metal door frames needs to be caulked. <br /> 12 . Window blinds are in installed in all areas. <br /> D O N A D I O <br /> & Associates , Architects, P.A . <br />