Laserfiche WebLink
Attachment " A " <br /> PROJECT UNDERSTANDING <br /> Indian River County desires to construct a new County Administration Complex on <br /> property bounded generally on the west by 20th Avenue , on the south by 26th Street , on <br /> the north by the Main Relief Canal and on the east by the Lateral E Canal . To address <br /> issues raised by City of Vero Beach officials , a traffic impact analysis is being <br /> undertaken to determine the impacts of the proposed development on the adjacent <br /> roadway network . <br /> Based on the understanding of the project , a scope of services , schedule and fee are as <br /> follows : <br /> SCOPE OF SERVICES <br /> Task 1 Traffic Impact Analysis <br /> Task 1 . 1 Pre-Application Conference - The CONSULTANT will attend a pre- <br /> application conference with Indian River County Traffic Engineer. The <br /> preliminary discussions that have been held that serve as the basis of this <br /> scope will be summarized . <br /> Task 1 . 2 Trip Generation - A projection of the anticipated project trips generated by <br /> the proposed County Administration Complex will be developed using ITE <br /> Trip generation 6th Ed . The new facility will be analyzed using ITE Code <br /> 733 -Government Building Complex . The existing administration building , <br /> purchasing building and other structures that will be demolished , will be <br /> taken as credits against the new trip generation . <br /> Task 1 . 3 Trip Distribution - The CONSULTANT will use the County's adopted <br /> thoroughfare network model to distribute traffic to and from the proposed <br /> facility. Modifications to the model to include Buena Vista Boulevard and <br /> the potential extension of 20th Avenue will be incorporated as appropriate . <br /> Task 1A Roadway and Intersection Analyses - CONSULTANT will perform <br /> analyses of the existing and future operation conditions of the significantly <br /> affected roadways and intersections as identified by the City of Vero <br /> Beach in the project vicinity. Roadway analyses will be based on PM peak <br /> hour peak season directional volumes . Intersection analyses will be based <br /> on PM peak hour peak season turning movement counts . Intersections will <br /> be analyzed using the HCS software and SYNCHRO where appropriate . <br /> Roadways will be analyzed using the FDOT Generalized Level of Service <br /> tables . No arterial analyses are included in this task . <br /> Task 1 . 5 Site Access - CONSULTANT will develop a driveway distribution for <br /> review and approval by the County Traffic Engineer. Project traffic will be <br /> assigned to the driveways based on the approved distribution . <br /> Recommendations for site access improvements will be addressed . <br /> Task 1 . 6 20th Avenue Extension - The study will be performed without the <br />