Laserfiche WebLink
Indian River County <br /> 00D., <br /> Turn r <br /> Administration Complex <br /> Final GMP Summary <br /> Allowances <br /> Report Date August 16 , 2005 <br /> The following sums are included as allowances in our GMP . The allowances include labor , material , <br /> unloading and taxes . In the event the actual cost of these items of work exceeds or is less than the <br /> individual allowance amount indicated , the GMP shall be increased or decreased by the difference <br /> between the actual cost and allowances , per terms of the Contract . <br /> Bid Package Description Amount <br /> 2 Water line extension $ 26 , 240 <br /> 2a Brick Pavers $217 , 810 <br /> 6 Millwork items that are not elevated in drawings $ 1827975 <br /> 9d Painted Mural $ 10 , 000 <br /> 9d Painted Wallcovering Mural $ 10 , 000 <br /> 12 Floor Mats $ 10 , 000 <br /> 14 Elevator cab finish allowances $ 22 , 500 <br /> 15a Kitchen plumbing and ventilation rough - in and final connections to $357000 <br /> equipment ( provided by Owner) . <br /> 17 Audio Visual Systems at the Commission Chambers <br /> Sound System $65 , 000 <br /> Multi - Media System $200 , 000 <br /> TV Lighting System $ 50 , 000 <br /> 17a Security System $250 , 000 <br /> Shell the space for the Emergency Operations Center ( includes decrease ( $ 524 , 000) <br /> in the scope of the mechanical and electrical work) <br /> � Y <br /> Page 2 <br />