My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-289
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 2:10:40 PM
Creation date
9/30/2015 9:03:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
08/23/2005
Control Number
2005-289
Agenda Item Number
11.C.2
Entity Name
Turner Construction
Subject
Amendment No. 2 - Guaranteed Maximum Price
Area
New County Administration Complex
Supplemental fields
SmeadsoftID
5140
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex Turner <br /> Indian River County, Florida <br /> M <br /> FINAL GMP SUMMARY <br /> i <br /> Report Date : August 16 , 2005 <br /> Bid Package Description GMP Total <br /> 1 General Requirements $ 175 , 000 <br /> 2 Sitework $2 , 5023340 <br /> 2a Demolition $ 1287630 <br /> 2b Tree Relocation $402900 <br /> 2c Temporary Fence $309138 <br /> 2d Landscaping $521 , 997 <br /> 2e Site Furnishing $ 1 , 314 <br /> 2f Hardscape allowance $217 , 810 <br /> 3 Foundation Concrete with concrete <br /> 3a Concrete $3 , 6325465 <br /> 4 Masonry $ 154465092 <br /> 5 Structural Steel & Miscellaneous Metals $ 1 , 1753011 <br /> 6 Millwork $550 , 539 <br /> 6a Cast Stone Columns $42, 648 <br /> 7 Waterproofing $54, 567 <br /> 7a Roofing $ 1 , 945 , 210 <br /> 7b Foamed-in-place Insulation $ 183800 <br /> 8 Doors , Frames , & Hardware $468 , 008 <br /> 8a Overhead Doors $49636 <br /> 8b Glass & Glazing $576 ,706 <br /> 9 Drywall & Stucco $254905728 <br /> 9a Tile $623 , 084 <br /> 9b Acoustical Ceiling $2629840 <br /> 9c VCT & Carpet $6233395 <br /> 9d Painting & Wall Coverings $445 , 078 <br /> 10 Toilet & Bath Accessories $70 , 720 <br /> 10a Louvers $45 , 321 <br /> 10b Flagpoles $3 , 856 <br /> 10c Signage $82 , 946 <br /> 10d Fire Extinguishers & Cabinets $ 12 , 539 <br /> 10f Access Flooring $49 , 435 <br /> 12 Floor Mats allowance $ 105000 <br /> 12a Window Treatments $ 155600 <br /> 12b Auditorium Seating $24 , 720 <br /> 14 Elevators $210 , 625 <br /> 14a Pneumatic Tube S stem $55 , 922 <br /> 15 Fire Protection $367 , 798 <br /> 15a HVAC and Plumbing $47125 , 727 <br /> 16 Electrical $490473831 <br /> 17 Commission Chambers Audio Visual allowance $315 , 000 <br /> 17 Security System allowance $2503000 <br /> Shell Space at Emergency Operations Center ($524 , 000) <br /> Owner's Contingency * included <br /> Construction Contingency $813 , 029 <br /> Subguard $352 ,313 <br /> Total Direct Work $2893079318 <br /> General Liability Insurance $4795753 <br /> P & P Bond $344 , 099 <br /> Builder's Risk Insurance $287 , 050 <br /> General Conditions $29262 , 048 <br /> Fee $ 134069174 <br /> Final GMP Total $3370869442 <br /> * See items 18 and 19 in General Section of Qualifications and Assumptions / <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.