A® <br />IA Document G701TN <br />�� - 2001 <br />Change Order <br />PROJECT (Name mut address): <br />New County Administration Building <br />Lying Adjacent to 27th Street, Vero <br />Beach, FI <br />CHANGE ORDER NUMBER: 009 <br />DATE: May 16, 2006 <br />TO CONTRACTOR (Nmne and address): ARCHITECT'S PROJECT NUMBER: 2102 <br />Turner Construction Company CONTRACT DATE: (Amendment #2) August 23, 2005 <br />800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br />Orlando, Florida 32803 Construction Management at Risk <br />S -16,0 <br />4066-/6v <br />OWNER:® <br />ARCHITECT: <br />CONTRACTOR: <br />FIELD: ❑ <br />OTHER: ❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />Reference Description Amount <br />COR -040 The GMP shell allowance is $524.000. The attached breakdown sheet reconciles the allowance <br />and provides more detailed information explaining the revised credit amount of $597,838 and <br />increase in savings of $73,838 ($73,838.00) <br />COR -037 This COR (Change Order Request) contained in Change Order #008 was approved May 2, 2006. <br />and stated "Utilize duct wrap in lieu of duct board for insulation on exposed interior rectangular <br />duct. Also, allow for maximum of 8 feet of Flex duct to return air grilles. (For a savings of <br />$21,000). The savinsgs should have been $37,498.00. To correct that error, an additional savings <br />for the owner in the amount of $16,498 needs to be taken. ($16,498.00) <br />Approval of these Change Items will not change the GMP but will increase the Owner's Contingency by $90,331 <br />The original Guaranteed Maximum Price was $ 33,086,442 <br />The net change by previously authorized Change Orders $ (3,844,244) <br />The Guaranteed Maximum Price prior to this Change Order was $ 29,242,198 <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ (0) <br />The new Guaranteed Maximum Price including this Change Order will be $ 29,242,198 <br />The <br />Contract Time will <br />be increased by Zero <br />( 0 <br />) days. <br />The <br />date of Substantial <br />Completion as of the <br />date <br />of this <br />Change <br />Order therefore is <br />January <br />21, <br />2007 <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County <br />Commissioners <br />ARCHITECT (Finn name) CONTRACTOR (Firm name) OWNER (Firm name) <br />609 17th §1salift, Vero Beach, Florida 800 N. Magnolia Avenue 1840 25th Street, Vero Beach,Florida <br />329(1 J Orlando, Florida 32803 32960 <br />RE <br />ADDRESSADDRESS ^ <br />(. <br />ire) �BY <br />(Signature) Y (Figur ure) ��J�(1xq <br />A Donadio Louis Fiore oseph A. Baird, County Administrator <br />Mped pante) (Typed name) Typed name) <br />S'%/G fBG <br />DA 6A—T I DATE / <br />AIA Document G701 TM -2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institutef Ar itects. All rights reserved. WARNING: This <br />AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized re AV <br />or distribution of this A e Document, or <br />any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum exte ossible under t This <br />document was produced by AIA software at 17:32:42 on 05/09/2006 under Order No. 1000192296_1 which expires 8/8/ 06, and is not f r <br />User Notes: (3 7595) <br />Reviewed and Recommended for Approvah <br />1cio4 S ! V <br />Steve Blum, Project Manager Thomas W Fram , General Services 6iredtor Pasonlbrown, Budget Director <br />