<br />IA Document G701TN
<br />�� - 2001
<br />Change Order
<br />PROJECT (Name mut address):
<br />New County Administration Building
<br />Lying Adjacent to 27th Street, Vero
<br />Beach, FI
<br />CHANGE ORDER NUMBER: 009
<br />DATE: May 16, 2006
<br />TO CONTRACTOR (Nmne and address): ARCHITECT'S PROJECT NUMBER: 2102
<br />Turner Construction Company CONTRACT DATE: (Amendment #2) August 23, 2005
<br />800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price -
<br />Orlando, Florida 32803 Construction Management at Risk
<br />S -16,0
<br />4066-/6v
<br />OWNER:®
<br />ARCHITECT:
<br />CONTRACTOR:
<br />FIELD: ❑
<br />OTHER: ❑
<br />THE CONTRACT IS CHANGED AS FOLLOWS:
<br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
<br />Reference Description Amount
<br />COR -040 The GMP shell allowance is $524.000. The attached breakdown sheet reconciles the allowance
<br />and provides more detailed information explaining the revised credit amount of $597,838 and
<br />increase in savings of $73,838 ($73,838.00)
<br />COR -037 This COR (Change Order Request) contained in Change Order #008 was approved May 2, 2006.
<br />and stated "Utilize duct wrap in lieu of duct board for insulation on exposed interior rectangular
<br />duct. Also, allow for maximum of 8 feet of Flex duct to return air grilles. (For a savings of
<br />$21,000). The savinsgs should have been $37,498.00. To correct that error, an additional savings
<br />for the owner in the amount of $16,498 needs to be taken. ($16,498.00)
<br />Approval of these Change Items will not change the GMP but will increase the Owner's Contingency by $90,331
<br />The original Guaranteed Maximum Price was $ 33,086,442
<br />The net change by previously authorized Change Orders $ (3,844,244)
<br />The Guaranteed Maximum Price prior to this Change Order was $ 29,242,198
<br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ (0)
<br />The new Guaranteed Maximum Price including this Change Order will be $ 29,242,198
<br />The
<br />Contract Time will
<br />be increased by Zero
<br />( 0
<br />) days.
<br />The
<br />date of Substantial
<br />Completion as of the
<br />date
<br />of this
<br />Change
<br />Order therefore is
<br />January
<br />21,
<br />2007
<br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
<br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
<br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
<br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
<br />Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County
<br />Commissioners
<br />ARCHITECT (Finn name) CONTRACTOR (Firm name) OWNER (Firm name)
<br />609 17th §1salift, Vero Beach, Florida 800 N. Magnolia Avenue 1840 25th Street, Vero Beach,Florida
<br />329(1 J Orlando, Florida 32803 32960
<br />RE
<br />ADDRESSADDRESS ^
<br />(.
<br />ire) �BY
<br />(Signature) Y (Figur ure) ��J�(1xq
<br />A Donadio Louis Fiore oseph A. Baird, County Administrator
<br />Mped pante) (Typed name) Typed name)
<br />S'%/G fBG
<br />DA 6A—T I DATE /
<br />AIA Document G701 TM -2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institutef Ar itects. All rights reserved. WARNING: This
<br />AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized re AV
<br />or distribution of this A e Document, or
<br />any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum exte ossible under t This
<br />document was produced by AIA software at 17:32:42 on 05/09/2006 under Order No. 1000192296_1 which expires 8/8/ 06, and is not f r
<br />User Notes: (3 7595)
<br />Reviewed and Recommended for Approvah