Laserfiche WebLink
New County Administration Building March 3, 2006 <br />Vero Beach, Florida <br />SCOPE OF WORK <br />for <br />Bid Package 8 — Doors and Hardware Installation <br />5. An Iterations to preps in doors or frames.to allow h are to be properly installed <br />(does ndt4qolude through bolting) <br />6. Instaila 'on0T7Wtlmrnum doors, frames a rdware and gates and related hardware, <br />including hardwarelt&tpd in specifica ' <br />7. Unless prior arrangemen a de, minimum of an 8 hour work day for one crew to be <br />ready upon being called t ' e. <br />8. Performance and p ent bond <br />9. Doors to be pr ' and pre -machined for finis dware. <br />10. Any alter ' to doors to allow proper clearance of t Ids. <br />11. Card ders — by security subcontractor <br />12. allation of the following doors in the following rooms and corridors: -301, 2.2-3021 <br />2.2-3061 2.2-308, 22-3090 2.2-310, 2.2-3119 2.2-312, 2.2-313, 2.2-314, 2.2-3 , .2-316, <br />2.2-317, 2,2-318, 2.2-319, 2.2-320, 22-3217 2,2-322, 2.2-323, 2.2-3249 2.2-325, 2.2- 6; <br />�2-327, 2,.2-330, 2.2-331. 2.2--322-and 22-3351-1 <br />D. ALTERNATES— fnot included in the contract price) <br />1. The Subcontract Amount includes all work indicated in the Contract Documents with the <br />exception of the installation of the doors and hardware in the area presently indicated as <br />the location for the Emergency Operations Center (EOC) on the 2nd floor of Building 2. <br />The following amount represents the value of the installation of the doors and hardware in <br />the area of the EOC on the 2nd floor of Building 2, included in the following rooms and <br />corridors: 2.2-301, 22-302, 2.2-3061 22-3081 2.2-3091 2.2-310,2.2-311, 2.2-312, 2.2-313, <br />2.2-314, 22-315, 2.2-316, 2.2-317, 2.2-318, 2.2-319, 2.2-320, 2.2-321, 2.2-3229 2.2-323, <br />2.2-324, 22-3251 2.2-326, 2.2-3270 2.2-330, 2.2-331, 2.2-332 and 2.2-333 <br />ALLOWANCES <br />F. <br />G. SCHEDULE <br />016 ADD $5,180.00 <br />This Subcontractor acknowledges that the sat ork w l procee rdance with the Project <br />Schedule as developed by the "P eam" and its Subcontractors an vised by the <br />"Project Team". Also, this�u ontractor agrees to participate in the requirements of t edule <br />as outlined in the�Rt of documents_ <br />END OF SCOPE OF WORK <br />'Attachment A" <br />Project 81153100 <br />Flle1CSJ 808200 Doors and Hardware Installation <br />Subcontract Agreement 81153100-047—John Robinson II, Inc., dba J. R. Enterprises <br />Page 4 of 4 <br />Initials <br />Sub: _ <br />TCCo; <br />