New County Administration Building March 3, 2006
<br />Vero Beach, Florida
<br />SCOPE OF WORK
<br />for
<br />Bid Package 8 — Doors and Hardware Installation
<br />5. An Iterations to preps in doors or frames.to allow h are to be properly installed
<br />(does ndt4qolude through bolting)
<br />6. Instaila 'on0T7Wtlmrnum doors, frames a rdware and gates and related hardware,
<br />including hardwarelt&tpd in specifica '
<br />7. Unless prior arrangemen a de, minimum of an 8 hour work day for one crew to be
<br />ready upon being called t ' e.
<br />8. Performance and p ent bond
<br />9. Doors to be pr ' and pre -machined for finis dware.
<br />10. Any alter ' to doors to allow proper clearance of t Ids.
<br />11. Card ders — by security subcontractor
<br />12. allation of the following doors in the following rooms and corridors: -301, 2.2-3021
<br />2.2-3061 2.2-308, 22-3090 2.2-310, 2.2-3119 2.2-312, 2.2-313, 2.2-314, 2.2-3 , .2-316,
<br />2.2-317, 2,2-318, 2.2-319, 2.2-320, 22-3217 2,2-322, 2.2-323, 2.2-3249 2.2-325, 2.2- 6;
<br />�2-327, 2,.2-330, 2.2-331. 2.2--322-and 22-3351-1
<br />D. ALTERNATES— fnot included in the contract price)
<br />1. The Subcontract Amount includes all work indicated in the Contract Documents with the
<br />exception of the installation of the doors and hardware in the area presently indicated as
<br />the location for the Emergency Operations Center (EOC) on the 2nd floor of Building 2.
<br />The following amount represents the value of the installation of the doors and hardware in
<br />the area of the EOC on the 2nd floor of Building 2, included in the following rooms and
<br />corridors: 2.2-301, 22-302, 2.2-3061 22-3081 2.2-3091 2.2-310,2.2-311, 2.2-312, 2.2-313,
<br />2.2-314, 22-315, 2.2-316, 2.2-317, 2.2-318, 2.2-319, 2.2-320, 2.2-321, 2.2-3229 2.2-323,
<br />2.2-324, 22-3251 2.2-326, 2.2-3270 2.2-330, 2.2-331, 2.2-332 and 2.2-333
<br />ALLOWANCES
<br />F.
<br />G. SCHEDULE
<br />016 ADD $5,180.00
<br />This Subcontractor acknowledges that the sat ork w l procee rdance with the Project
<br />Schedule as developed by the "P eam" and its Subcontractors an vised by the
<br />"Project Team". Also, this�u ontractor agrees to participate in the requirements of t edule
<br />as outlined in the�Rt of documents_
<br />END OF SCOPE OF WORK
<br />'Attachment A"
<br />Project 81153100
<br />Flle1CSJ 808200 Doors and Hardware Installation
<br />Subcontract Agreement 81153100-047—John Robinson II, Inc., dba J. R. Enterprises
<br />Page 4 of 4
<br />Initials
<br />Sub: _
<br />TCCo;
<br />
|