Laserfiche WebLink
( - ( fCo-cpy1 <br />New County Administration Building October 17; 2045 <br />Vero Beach, Florida <br />SCOPE OF WORK <br />for <br />Rolling Service Doors <br />Enforcement Fine System <br />gist in Tumer's efforts to provide a sale workplaoa, the following violations and <br />=s.�seciated with them will be enforced on the project, <br />1. No hard hat reirauy <br />$100-TumerTicket <br />2. No safety glasses <br />3. Remove guardrail withoufa a nate replacement = $100 Turner Ticket <br />4 P $500 Turner Ticket <br />4. Removed ening protection wi` ' +discharge <br />tut~adt,l,000Tumer <br />S. Unsecured compressed gascylinclemx Ticket +discharge <br />6, Open electric panels $1,000 Turner Ticket <br />7. No show for site safetyinspections `, $1,000 Turner Ticket <br />8, Nofallpmteption .$1,000 Turner Ticket <br />$5,000 Turner Ticket + discharge <br />li.. Turner Constructn•Company has a Zero -Tolerance policy for all fall protection issues. <br />The first time any employee is observed not using fall protection and'afall hazard over six <br />feet (6') exlsts, the employee will be removed from the project.. In addition the foreman <br />May also'he removed if enforcement measures are not being enforced No Exeptions. <br />Provide and maintain all fall protection equipment as needed to perform this scope of o[�c <br />Subcontractor's attention 1s called to Turner's Safety Policy, which is to be strictly observed and' <br />rigkily enforced by. the: Subcontractor during the. performance of the work under this subcontract. <br />- <br />"Allpersonnel working at heights of six (6).feet and above the ground will be tied of, NO <br />EXCEPTIONS. Subcontractors shall design and install any required or necessaryfall protection <br />systems, required to achieve 100% fall protection for Subcontractor's work force <br />C. EXCLUSIONS - <br />-�/A-'� 1- -Inslallabon of embeds (if required). - by concrete or masonry subcontractor <br />D. ALTERNATES <br />1. Delete -roll -up counter door in Building 2 #2 <br />ALWANCES2-324D Deduct ($985.00) <br />LO't� W <br />NONE <br />F. �UNfi"PRiCES' <br />NONE '-. �`---•'-s-'-" <br />G. SCHEDULE <br />Thissubcontractor acknowledges }hat,ftie said work will proceed in„aeco`rd na ce with the Project Schedule <br />as developed by the "Project Team" and it's -Subcontractors and as ievisetl by the "Project Team Also, this <br />subcontractor agrees to participate in the regcirem�ents`of .the schedule as outlined in the contract <br />documents. The work of this agreement will require tharsubmittals, shop drawings, coordination drawings, <br />team. . sequenced in accordance with the aforementioned schedufe-unless agreed to otherwise by the project <br />t�.. <br />END OF SCOPE OF WORK <br />I <br />"Attachment A" <br />Project #1153100 <br />File/CSI 08331 Rolling Service Doors Sub <br />TSub <br />Subcontract Agreement 81153100 -018 -American Roll -Up Door Company <br />Page 3 of 3 <br />