My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-160
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 1:45:20 PM
Creation date
9/30/2015 9:42:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/16/2006
Control Number
2006-160
Agenda Item Number
7.Z.
Entity Name
Turner Construction Company
Subject
Change Order #009 - GMP Shell Allowance
Area
New County Administration Bulding
Supplemental fields
SmeadsoftID
5629
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MILLER ELECTRIC COMPANY <br />November 17, 2005 <br />Turner Construction Company. <br />800 North Magnolia Ave.. <br />Orland, FL 32803 <br />ATTN: Tom Lail <br />RE: New County Administration Buildings <br />PCO-? <br />COR -003 <br />2251 RoS ELL ST. (32204) <br />P.O. Box 1799 <br />JACKSONVILLE, FL 32201 <br />904.388.8000 <br />FAx 904.389.8653 <br />Tom, <br />We request that a change order be issued for additional work associated with the above <br />referenced project. <br />Description <br />Scope changes associated with new 9/21/05 "For Construction" drawing revisions. An outline of <br />these changes is as follows: <br />Chiller Building <br />1.) Drawing 0-E1.2, Delete the Dish Farm ......................................... <$4,571.00> <br />Building One <br />2.) Drawing 0-E4.1.6 Downsize generator transfer switch and circuitry. Downsize EDP 1 <br />and MDPA...... ....... ` .................. <$9,356.00> <br />Building Two <br />3.) Drawing 2-E1.1.2 Delete CU 2-2-1 and 2-2-2 andI "t,add 2-2-3 ............... <$2;384.00> <br />4.) Drawing 2-E1.2.1, 1.2.2; 2.0.1, 3.0.2 and 3.0.4. Shell 2 a, Floor Offices <br />......... ...... ............ ........... j .'. ..... ...... r: ............... <$5%692.00> <br />5.) Drawing 2-E1.2.1 and 2.2.1 Changes to southwest Conference and adjacent <br />offices. ........... .......:. "......... .....:..'<$837.00> <br />6.) 0-E4.1.0 Downsize generator transfer switch and circuitry,- Downsize EDP-2`and <br />MDPB, Delete panel 2EP2, 2EP2A 2CP2W, 2P2Efl,A and associated transformers and <br />circuitry. Add panel2H2A .... is ... .............. <$34,700.00> <br />Price Impact COR -003 ..... ........ ....... <$111,540.00> <br />Please provide a written change <br />order as soon as possible. <br />We can not proceed with the <br />additional work associated with <br />this change <br />order request <br />without written authorization. <br />EC 0000011 <br />CG -C047556 <br />RECEIVED <br />NOV 30 2005 <br />TURNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.