Laserfiche WebLink
Fire & <br />Security <br />Simp/exGrinne// <br />To: Turner Construction <br />Attn: Lou Fiore <br />From: Bill Kimmen <br />Re: Indian River Admin Bldg. 2 EOC Change <br />i <br />SimpiexGrinneii <br />3701 N. John Young Parkway <br />Suite 110 <br />Orlando, FL 32804 <br />Phone 407-235-1135 <br />Fax 407-235-1150 <br />13 Dec. 2005 <br />I have had a chance to review the 100% design drawings that incorporates the changes in <br />fire sprinkler to shell the EOC area. Your statement of work provides for an allowance of <br />$7.640.00 for this change and has been deducted from the original contract price. Though <br />the shell of this area may account for cost savings in other trades it actually remains the <br />same for the fire sprinkler system. The total number of sprinkler heads remains the same in <br />the revised EOC area. They have changed from pendant heads to upright heads. I am <br />requesting $7,640.00 be added back into the contract. <br />The new contract amount should be $366,640.00. <br />Thank You, <br />Original signed <br />William Kimmen <br />Sprinkler Systems Sales Rep. <br />SimplexGrinnell <br />wkimmen@tVcoint.com <br />