Laserfiche WebLink
sfFe Indian River County Administration Complex <br />I Indian River County, Florida <br />Allowance Shell Space at Emergency Operations Center <br />Report Date: 01 May 2006 <br />" <br />BP <br />SummaryTotal <br />per Sub Quote <br />GMP ALLOWANCE <br />$5243000 <br />II <br />03a <br />Concrete <br />($8,394) <br />04 <br />Masonry <br />($24,075) <br />05.2 <br />Aluminum Fabrications <br />($141550) <br />4 <br />06 <br />Millwork <br />($71406) <br />5 <br />08 <br />Doors, Frames & Hardware - material <br />($23,016) <br />G <br />08 <br />Doors, Frames & Hardware - installation <br />($51180) <br />7 <br />08 <br />Glass & Glazing <br />($4,200) <br />s <br />08a <br />Roll Up Counter Door <br />($985) <br />e <br />09 <br />Metal Studs & Drywall <br />($505680) <br />10 <br />09a <br />Tile <br />($21,790) <br />ii <br />09b <br />Acoustical Ceiling <br />($342380) <br />iz <br />09c <br />VCT & Carpet <br />($81,464) <br />13 <br />09d <br />Painting <br />($10,088) <br />14 <br />10 <br />Toilet & Bath Accessories <br />($113243) <br />15 <br />10c <br />Signage <br />($2,252) <br />16 <br />101 <br />Access Flooring <br />($17,048) <br />7 <br />15a <br />HVAC & Plumbing - Subcontractor <br />'& <br />($291880) <br />is <br />15a <br />HVAC Plumbing - Turner Logistics <br />($479620) <br />19 <br />16 <br />Electrical & Communications - Subcontractor <br />($111,540) <br />20 <br />16 <br />Electrical - Turner Logistics <br />($921047) <br />EOC ALLOWANCE ADJUSTMENT <br />($73,838) <br />Page 1 <br />