Laserfiche WebLink
#A1A <br /> Document G704TM - 2000 <br /> Certificate of Substantial Completion <br /> PROJECT: PROJECT NUMBER: 2102. 18.7 OWNER: <br /> (Name and address): CONTRACT FOR: General Construction ARCHITECT: ❑ <br /> Indian River County CONTRACT DATE: August 04, 2004 <br /> Administration Building 2 CONTRACTOR: ❑ <br /> 1800 27th Street <br /> Vero Beach, Florida 32960 FIELD: ❑ <br /> TO OWNER: TO CONTRACTOR: OTHER: ❑ <br /> (Name and address): (Name and address): <br /> Indian River County Turner Construction, Co. <br /> 1800 27°h Street 800 N. Magnolia Avenue, Suite 500 <br /> Vero Beach, Florida 32960 Orlando, Florida 32803 <br /> PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: <br /> Complete Building 2 as pemlitted and Site Plan approved. <br /> The Work performed under this Contract has been reviewed and found, to the Architect' s best knowledge, information and belief, <br /> to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated <br /> portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for <br /> its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established <br /> by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except <br /> as stated below: <br /> Warranty Date of Commencement <br /> Complete Building #2. 08/03/07 <br /> Donadio and Associates 08/03/07 <br /> Architects, P.A. <br /> ARCHITECT DATE OF ISSUANCE <br /> A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br /> responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in <br /> writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate <br /> of Payment or the date of final payment. <br /> Cost estimate of Work that is incomplete or detective: S 40,000.00 <br /> The Contractor will complete or correct the Work on the list of items attached hereto within Thirty ( 30 ) days from the above <br /> date of Substantial Completion. w <br /> Turner Construction, Co. <br /> CONTRACTOR BY DATA - <br /> u <br /> The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 8:00A.M. (time) <br /> on 08/04/07 (date). ¢ c ` z <br /> 1 <br /> Indian River County ,� Q w 4 J ¢ O <br /> OWNER BY <br /> DATY 0 w C < <br /> cc <br /> The responsibilities of the Owner Contractor for security, maintenance, heat, utilities, damage to the Work and insurance <br /> shall be as follows: Q -_. <br /> (Note: Owner's and Contractor 's legal and insurance counsel should determine and review insurance requirements and <br /> coverage.) <br /> Owner is responsible for Security, Maintenance, Heat, Utilities, Damage to Work & Insurance for Building 2. <br /> AIA Document G704TM — 2000. Copyright 0 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING : This Ale <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any 1 <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by All software at 11 :08:36 on 08/06/2007 under Order No. 1000314206_1 which expires on 7131 /2008, and is not for resale. <br /> User Notes: n /� 1 (1274022894) <br />