2 . 1 . 7. 5 If the budget for the Cost of the Work is exceeded by the lowest bona fide bid or
<br /> negotiated proposal, the Owner shall:
<br /> . 1 give written approval of an increase in the budget for the Cost of the Work;
<br /> . 2 authorize rebidding or renegotiating of the Project within a reasonable time;
<br /> . 3 terminate in accordance with Subparagraph 1.3.8.5; or
<br /> . 4 cooperate in revising the Project scope and quality as required to reduce the
<br /> Cost of the Work.
<br /> 2 . 1 . 7. 6 If the Owner chooses to proceed under Clause 2.1.7.5.4, the Architect, without
<br /> additional compensation, shall modify the documents for which the Architect is responsible
<br /> under this Agreement as necessary to comply with the budget for the Cost of the Work. The
<br /> modification of such documents shall be the limit of the Architect's responsibility under this This document has important legal
<br /> Paragraph 2.1.7. The Architect shall be entitled to compensation in accordance with this consequences. Consultation
<br /> with an
<br /> Agreement for all services performed whether or not construction is commenced. attorney is encouraged with respect to
<br /> its completion or modification.
<br /> AUTHENTICATION OF THIS
<br /> ARTICLE 2 . 2 SUPPORTING SERVICES ELECTRONICALLY DRAFTED AIA
<br /> 2 . 2 . 1 Unless specifically designated in Paragraph 2.8.3, the services in this Article 2.2 shall DOCUMENT MAY BE MADE
<br />BY USING
<br /> be provided by the Owner or the Owner's consultants and contractors. AIA DOCUMENT D401.
<br /> 2 . 2 . 1 . 1 The Owner shall furnish a program setting forth the Owner's objectives, schedule ,
<br /> constraints and criteria, including space requirements and relationships, special equipment,
<br /> systems and site requirements .
<br /> 2 . 2 . 1 . 2 The Owner shall furnish surveys to describe physical characteristics, legal limitations
<br /> and utility locations for the site of the Project, and a written legal description of the site. The
<br /> surveys and legal information shall include , as applicable, grades and lines of streets, alleys,
<br /> pavements and adjoining property and structures; adjacent drainage; rights-of-way,
<br /> restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of
<br /> the site; locations, dimensions and necessary data with respect to existing buildings, other
<br /> improvements and trees; and information concerning available utility services and lines, both
<br /> public and private, above and below grade, including inverts and depths. All the information
<br /> on the survey shall be referenced to a Project benchmark.
<br /> 2 . 2 . 1 . 3 The Owner shall furnish services of geotechnical engineers which may include but
<br /> are not limited to test borings, test pits, determinations of soil bearing values, percolation
<br /> tests, evaluations of hazardous materials, ground corrosion tests and resistivity tests, including
<br /> necessary operations for anticipating subsoil conditions, with reports and appropriate
<br /> recommendations.
<br /> ARTICLE 2 . 3 EVALUATION AND PLANNING SERVICES
<br /> 2 . 3 . 1 The Architect shall provide a Written preliminary evaluation of the information
<br /> furnished by the Owner under this Agreement, including the Owner's program and schedule , A
<br /> requirements and budget for the Cost of the Work, each in terms of the other. The Architect
<br /> shall review such information to ascertain that it is consistent with the requirements of the IIIII�
<br /> Project and shall notify the Owner of any other information or consultant services that may
<br /> be reasonably needed for the Project. © 1997 AIA®
<br /> AIA DOCUMENT B141 - 1997
<br /> 2 . 3 . 2 The Architect shall provide a preliminary evaluation of the Owner's site for the STANDARD FORM AGREEMENT
<br /> Project based on the information provided by the Owner of site conditions, and the Owner's The American Institute of Architects
<br /> program , schedule and budget for the Cost of the Work. 1735 New York Avenue N .W.
<br /> Washington, D .C. 20006-5292
<br /> 2 . 3 . 3 The Architect shall review the Owner's proposed method of contracting for
<br /> construction services and shall notify the Owner of anticipated impacts that such method
<br /> 1917, 19260 148, 1951 , 19531 1958, 19611 1963, 1 6 , 1967, 19701 19741 1977, 19871 0 1997 by T e American
<br /> Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without
<br /> written permission of the AIA violates the copyright laws of the United States and will subject the violator to
<br /> legal prosecution . WARNING: Unlicensed photocopying violates U .S . copyright laws and will subject the
<br /> violator to legal prosecution. This document was electronically produced with permission of the AIA and can
<br /> be reproduced in accordance with your license without violation until the date of expiration as noted below.
<br /> expiration as noted below. User Document: standard agreement admin bldg 97bl4l(4-8-03) . aia -- 5/5/2003 . AIA
<br /> License Number 1127252, which expires on 7/31/2003.
<br /> 18