Laserfiche WebLink
responsible for the adequacy of the performance or design criteria required by the Contract <br /> Documents. <br /> 3 . 13 USE OF SITE <br /> 3 . 13 . 1 The Contractor shall confine operations at the site to areas permitted by law, <br /> ordinances, permits and the Contract Documents and shall not unreasonably encumber the <br /> site with materials or equipment. <br /> 3 . 14 CUTTING AND PATCHING <br /> 3 . 14 . 1 The Contractor shall be responsible for cutting, fitting or patching required to <br /> complete the Work or to make its parts fit together properly. <br /> 3 . 14 . 2 The Contractor shall not damage or endanger a portion of the Work or fully or <br /> partially completed construction of the Owner or separate contractors by cutting, patching or <br /> otherwise altering such construction, or by excavation. The Contractor shall not cut or THIS DOCUMENT HAS IMPORTANT <br /> LEGAL <br /> otherwise alter such construction by the Owner or a separate contractor except with written CONSEQUENCES. CONSULTATION WITH AN <br /> consent of the Owner and of such separate contractor, such consent shall not be unreasonably ATTORNEY IS ENCOURAGED WITH RESPECT <br /> withheld. The Contractor shall not unreasonably withhold from the Owner or a separate TO ITS COMPLETION OR MODIFICATION. <br /> contractor the Contractors consent to cutting or otherwise altering the Work. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA <br /> 3 . 15 CLEANING UP DOCUMENT MAY BE MADE BY USING AIA <br /> DOCUMENT D401. <br /> 3 . 15 . 1 The Contractor shall keep the premises and surrounding area free from accumulation <br /> of waste materials or rubbish caused by operations under the Contract. At completion of the This document has been approved and <br /> Work, the Contractor shall remove from and about the Project waste materials, rubbish, the endorsed by The Associated General <br /> Contractor's tools, construction equipment, machinery and surplus materials. Contractors of America. <br /> 3 . 15 . 2 If the Contractor fails to clean up as provided in the Contract Documents, the <br /> Owner may do so and the cost thereof shall be charged to the Contractor. <br /> 3 . 16 ACCESS TO WORK <br /> 3 . 16 . 1 The Contractor shall provide the Owner and Architect access to the Work in <br /> preparation and progress wherever located. <br /> 3 . 17 ROYALTIES, PATENTS AND COPYRIGHTS <br /> 3 . 17. 1 The Contractor shall pay all royalties and license fees. The Contractor shall defend <br /> suits or claims for infringement of copyrights and patent rights and shall hold the Owner and <br /> Architect harmless from loss on account thereof, but shall not be responsible for such defense <br /> or loss when a particular design, process or product of a particular manufacturer or <br /> manufacturers is required by the Contract Documents or where the copyright violations are <br /> contained in Drawings, Specifications or other documents prepared by the Owner or <br /> Architect. However, if the Contractor has reason to believe that the required design, process or <br /> product is an infringement of a copyright or a patent, the Contractor shall be responsible for <br /> such loss unless such belief 4ifeffnetien is promptly furnished in writing] to the Architect <br /> and the Owner. <br /> 3 . 18 INDEMNIFICATION <br /> 3 . 18 . 1 To the fullest extent permitted by law and to the extent claims, damages, losses or <br /> expenses are not covered by insurance purchased by �, ,y <br /> the Contractor in accordance with lzaregre}�}� ARTICLE u:3, the Contractor shall indemnify 1;•a .. �" <br /> and hold harmless the Owner, Architect, Architect's consultants, and agents and employees of <br /> any of them from and against claims, damages, losses and expenses, including but not limited <br /> to attorneys ' fees, arising out of or resulting from performance of the Work, provided that Ot997 AIA® <br /> such claim , damage, loss or expense is attributable to bodily injury, sickness, disease or death, AIA DOCUMENT A201 - 1997 <br /> GENERAL CONDITIONS OF THE <br /> Copyright 1911, 1 15, 1 1 1 5, 1 7, 1 51, 1 CONTRACT FOR CONSTRUCTION <br /> 1 1, 19 1 6, 1 7, 197 , 197 , 1987, 1997 y T e <br /> American Institute of Architects . Fifteenth Edition. Reproduction of the material herein or substantial The <br />American Institute of Architects <br /> quotation of its provisions without written permission of the AIA violates the copyright laws of the United 1735 New York <br /> Avenue, N .W. <br /> States and will subject the violate to legal prosecution . WARNING : Unlicensed photocopying violates U .S. Washington, D.C. <br /> 20006-5292 <br /> copyright laws and will subject the violator to legal prosecution. This document was electronically produced <br /> with permission of the AIA and can be reproduced in accordance with your license without violation until the <br /> date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted <br /> below. User Document: general conditions (standard) admin bldg 97 a201 .aia -- 5/52003. AIA License Number <br /> 1127252, which expires on 7/312003. <br /> 18 <br />