responsible for the adequacy of the performance or design criteria required by the Contract
<br /> Documents.
<br /> 3 . 13 USE OF SITE
<br /> 3 . 13 . 1 The Contractor shall confine operations at the site to areas permitted by law,
<br /> ordinances, permits and the Contract Documents and shall not unreasonably encumber the
<br /> site with materials or equipment.
<br /> 3 . 14 CUTTING AND PATCHING
<br /> 3 . 14 . 1 The Contractor shall be responsible for cutting, fitting or patching required to
<br /> complete the Work or to make its parts fit together properly.
<br /> 3 . 14 . 2 The Contractor shall not damage or endanger a portion of the Work or fully or
<br /> partially completed construction of the Owner or separate contractors by cutting, patching or
<br /> otherwise altering such construction, or by excavation. The Contractor shall not cut or THIS DOCUMENT HAS IMPORTANT
<br /> LEGAL
<br /> otherwise alter such construction by the Owner or a separate contractor except with written CONSEQUENCES. CONSULTATION WITH AN
<br /> consent of the Owner and of such separate contractor, such consent shall not be unreasonably ATTORNEY IS ENCOURAGED WITH RESPECT
<br /> withheld. The Contractor shall not unreasonably withhold from the Owner or a separate TO ITS COMPLETION OR MODIFICATION.
<br /> contractor the Contractors consent to cutting or otherwise altering the Work. AUTHENTICATION OF THIS
<br /> ELECTRONICALLY DRAFTED AIA
<br /> 3 . 15 CLEANING UP DOCUMENT MAY BE MADE BY USING AIA
<br /> DOCUMENT D401.
<br /> 3 . 15 . 1 The Contractor shall keep the premises and surrounding area free from accumulation
<br /> of waste materials or rubbish caused by operations under the Contract. At completion of the This document has been approved and
<br /> Work, the Contractor shall remove from and about the Project waste materials, rubbish, the endorsed by The Associated General
<br /> Contractor's tools, construction equipment, machinery and surplus materials. Contractors of America.
<br /> 3 . 15 . 2 If the Contractor fails to clean up as provided in the Contract Documents, the
<br /> Owner may do so and the cost thereof shall be charged to the Contractor.
<br /> 3 . 16 ACCESS TO WORK
<br /> 3 . 16 . 1 The Contractor shall provide the Owner and Architect access to the Work in
<br /> preparation and progress wherever located.
<br /> 3 . 17 ROYALTIES, PATENTS AND COPYRIGHTS
<br /> 3 . 17. 1 The Contractor shall pay all royalties and license fees. The Contractor shall defend
<br /> suits or claims for infringement of copyrights and patent rights and shall hold the Owner and
<br /> Architect harmless from loss on account thereof, but shall not be responsible for such defense
<br /> or loss when a particular design, process or product of a particular manufacturer or
<br /> manufacturers is required by the Contract Documents or where the copyright violations are
<br /> contained in Drawings, Specifications or other documents prepared by the Owner or
<br /> Architect. However, if the Contractor has reason to believe that the required design, process or
<br /> product is an infringement of a copyright or a patent, the Contractor shall be responsible for
<br /> such loss unless such belief 4ifeffnetien is promptly furnished in writing] to the Architect
<br /> and the Owner.
<br /> 3 . 18 INDEMNIFICATION
<br /> 3 . 18 . 1 To the fullest extent permitted by law and to the extent claims, damages, losses or
<br /> expenses are not covered by insurance purchased by �, ,y
<br /> the Contractor in accordance with lzaregre}�}� ARTICLE u:3, the Contractor shall indemnify 1;•a .. �"
<br /> and hold harmless the Owner, Architect, Architect's consultants, and agents and employees of
<br /> any of them from and against claims, damages, losses and expenses, including but not limited
<br /> to attorneys ' fees, arising out of or resulting from performance of the Work, provided that Ot997 AIA®
<br /> such claim , damage, loss or expense is attributable to bodily injury, sickness, disease or death, AIA DOCUMENT A201 - 1997
<br /> GENERAL CONDITIONS OF THE
<br /> Copyright 1911, 1 15, 1 1 1 5, 1 7, 1 51, 1 CONTRACT FOR CONSTRUCTION
<br /> 1 1, 19 1 6, 1 7, 197 , 197 , 1987, 1997 y T e
<br /> American Institute of Architects . Fifteenth Edition. Reproduction of the material herein or substantial The
<br />American Institute of Architects
<br /> quotation of its provisions without written permission of the AIA violates the copyright laws of the United 1735 New York
<br /> Avenue, N .W.
<br /> States and will subject the violate to legal prosecution . WARNING : Unlicensed photocopying violates U .S. Washington, D.C.
<br /> 20006-5292
<br /> copyright laws and will subject the violator to legal prosecution. This document was electronically produced
<br /> with permission of the AIA and can be reproduced in accordance with your license without violation until the
<br /> date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted
<br /> below. User Document: general conditions (standard) admin bldg 97 a201 .aia -- 5/52003. AIA License Number
<br /> 1127252, which expires on 7/312003.
<br /> 18
<br />
|