Laserfiche WebLink
posting danger signs and other warnings against hazards, promulgating safety regulations and <br /> notifying owners and users of adjacent sites and utilities . <br /> 10. 2 . 4 When use or storage of explosives or other hazardous materials or equipment or <br /> unusual methods are necessary for execution of the Work, the Contractor shall exercise <br /> utmost care and carry on such activities under supervision of properly qualified personnel . <br /> 10. 2 . 5 The Contractor shall promptly remedy damage and loss ( other than damage or loss <br /> insured under property insurance required by the Contract Documents) to property referred <br /> to in Clauses 10.2.1.2 and 10 .2.1.3 caused in whole or in part by the Contractor, a Subcontractor, <br /> a Sub-subcontractor, or anyone directly or indirectly employed by any of them , or by anyone <br /> for whose acts they may be liable and for which the Contractor is responsible under Clauses <br /> 10.2. 1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or <br /> Architect or anyone directly or indirectly employed by either of them , or by anyone for whose <br /> acts either of them may be liable, and not attributable to the fault or negligence of the THIS DOCUMENT <br /> HAS IMPORTANT LEGAL <br /> Contractor. The foregoing obligations of the Contractor are in addition to the Contractor's CONSEQUENCES. CONSULTATION WITH <br />AN <br /> obligations under Paragraph 3.18. ATTORNEY IS ENCOURAGED WITH RESPECT <br /> TO ITS COMPLETION OR MODIFICATION. <br /> 10. 2 . 6 The Contractor shall designate a responsible member of the Contractor's AUTHENTICATION OF THIS <br /> organization at the site whose duty shall be the prevention of accidents . This person shall be ELECTRONICALLY DRAFTED AIA <br /> the Contractor's superintendent unless otherwise designated by the Contractor in writing to DOCUMENT MAY BE MADE BY USING AIA <br /> the Owner and Architect. DOCUMENT D401. <br /> This document has been approved and <br /> 10. 2 . 7 The Contractor shall not load or permit any part of the construction or site to be endorsed by The Associated <br /> General <br /> loaded so as to endanger its safety. Contractors of America. <br /> 10. 3 HAZARDOUS MATERIALS <br /> 10. 3 . 1 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or <br /> death to persons resulting from a material or substance, including but not limited to asbestos <br /> or polychlorinated biphenyl ( PCB ) , encountered on the site by the Contractor, the Contractor <br /> shall, upon recognizing the condition, immediately stop any Ongoing Work in the affected <br /> area and report the condition to the Owner and Architect in writing. <br /> 10. 3 . 2 The Owner shall obtain the services of a licensed laboratory to verify the presence or <br /> absence of the material or substance reported by the Contractor and, in the event such <br /> material or substance is found to be present, to verify that it has been rendered harmless. <br /> Unless otherwise required by the Contract Documents, the Owner shall furnish in writing to <br /> the Contractor and Architect the names and qualifications of persons or entities who are to <br /> perform tests verifying the presence or absence of such material or substance or who are to <br /> perform the task of removal or safe containment of such material or substance. The <br /> Contractor and the Architect will promptly reply to the Owner in writing stating whether or <br /> not either has reasonable objection to the persons or entities proposed by the Owner_ , and in <br /> the event of an objection , the specific reasons therefor. If either the Contractor or <br /> Architect has an a reasonable objection to a person or entity proposed by the Owner and <br /> fully complies with the next proceeding sentence the Owner shall propose another to I` <br /> whom the Contractor and the Architect have no reasonable objection . When If the absence <br /> of the material or substance is verified Work shall immediately resume without <br /> adjustment of the Contract Time or the Contract sum If the presence of the material <br /> or substance is verified , when the material or substance has been rendered harmless, Work n ., <br /> in the affected area shall resume upon written agreement of the Owner and Contractor. The <br /> Contract Time shall be extended if and as appropriate &*ately and the Contract Sum <br /> shall be increased in the amount of the Contractor's reasonable additional and incurred costs 01997 AIA® <br /> AIA DOCUMENT A201 - 1997 <br /> GENERAL CONDITIONS OF THE <br /> Copyright 1911 , 115, 118, 1925, 1 7, 1951, 1958, 1961 , 1963, 11967, 1970s 1976, 17, 1997 byTe CONTRACT <br />FOR CONSTRUCTION <br /> American Institute of Architects. Fifteenth Edition . Reproduction of the material herein or substantial The <br />American Institute of Architects <br /> quotation of its provisions without written permission of the AIA violates the copyright laws of the United 1735 New York <br /> Avenue, N .W. <br /> States and will subject the violate to legal prosecution. WARNING: Unlicensed photocopying violates U .S . Washington, D .C . <br />20006-5292 <br /> copyright laws and will subject the violator to legal prosecution . This document was electronically produced <br /> with permission of the AIA and can be reproduced in accordance with your license without violation until the <br /> date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted <br /> below. User Document: general conditions (standard) admin bldg 97 a201 .aia -- 5/5/2003. AIA License Number <br /> 1127252, which expires on 7/31/2003. <br /> 37 <br />