Laserfiche WebLink
other such improvements as site design . parking and stormwater facilities <br /> The Owner and Architect agree as follows : <br /> To design administrative offices and facilities for the needs of the Supervisor of Elections Buildings and <br /> Grounds Division support facilities, storage/warehouse facilities and Animal Control facilities containing <br /> aVproximately 30 ,000 square feet in area . The form of design should result in an attractive <br /> and <br /> economical rigid steel frame type structure with concrete block and stucco exterior. It is desired that that <br /> this building coordinate with the appearance of the adjacent Utility Operations Project and the Road and <br /> Bridge site . <br /> The Owner' s Program is , <br /> Adequate area to support the identified users based on programming_previously completed as part of the <br /> PRIMARY CONTRACT for the New County Administration Complex <br /> The financial parameters are as follows : <br /> 1 Amount of the Owner's overall budget for the entire Project, including the <br /> Architect's compensation, is : $ 2,921 ,400 .00 <br /> . 2 Amount of the Owner's budget for the Cost of the Work, excluding the <br /> Architect's compensation, is : $ 2,700,000.00 <br /> . 3 The estimated Construction Budget for the building alone is $ 2,700,000 .00 <br /> 1 . 1 .2 .6 The time parameters are : <br /> Proposed Design Schedule is based on the following duration of activities : <br /> 1 . Programming and Program Validation 1 . 0 month <br /> 2 . County Review <br /> 3 , Schematic Design Documents 1 . 5 months " <br /> 4 . County Review <br /> 5 . Design Development Documents 2 . 0 months <br /> 6 . County Review <br /> 7 . 100 % . Completion of Construction Documents 4 . 0 months <br /> 8 . County Review <br /> * Review time is estimated to be 2 to 4 weeks . <br /> * * Schematic Design Time Frame may increase due to Site Plan Approval <br /> 1 . 1 . 2 . 7 The proposed procurement or delivery method for the Project is : <br /> (Identify method such as competitive bid, negotiated contract, or construction management) <br /> Competitive Bid utilizing Building Contractor, licensed, insured and bonded in the State of Florida. <br /> 1 . 1 . 2 . 8 Other parameters are : <br /> (identify special characteristics or needs of the Project such as energy, environmental or historic <br /> preservation requirements) <br /> All elements or combination of elements of the design shall conform to Applicable Regulatory <br /> requirements of Agencies having jurisdiction over the Project as a whole or in part <br />