Laserfiche WebLink
This document prepared by and return to: <br />Indian River County <br />Public Works Department <br />1840 25th Street <br />Vero Beach, Florida 32960 <br />BDB/bm <br />A. The north entrance will be on 57th Street approximately 230 feet east of 58th <br />Avenue. The Developer shall construct a two-lane road for a distance of approximately <br />230 feet from 58th Avenue to the entrance of the Project, as shown on the preliminary <br />plat dated 4/22/04 and Exhibit "B" attached hereto. The Developer will also plan, <br />design and construct a southbound left tum lane and a northbound right tum lane on <br />58th Avenue at the intersection of 57th Street. All road construction shall be in <br />compliance with Florida Department of Transportation standards, and to the satisfaction <br />of County. County finds that Developer shall not be required to pay or contribute to the <br />acquisition or construction of 57th Street except for the 230 foot extension described <br />above. <br />B. The southem entrance shall be located 3,582 feet east of the 58th Avenue <br />centerline as shown on Exhibit "C" attached. The parties agree that Developer's share of <br />the cost of design and construction of the bridge and roadway is $445,400.00 (the <br />'Contribution Amount') representing $868 per lot in the proposed Project. Developer <br />shall pay the sum of $445,400.00 to County as follows: at the time developer (or its <br />assign or agent) applies for a building permit for a lot in the Project, Developer shall pay <br />County the sum of $868.00 until the obligation of $445,400.00 to County is satisfied. <br />Developer's failure to pay the $868.00 upon application for a building permit shall be <br />adequate grounds for County to deny issuance of the building permit. <br />C. The Bridge shall be designed and constructed by the County in conjunction <br />with the construction of 53rd Street and shall be compatible with the Project's Southem <br />Entrance. The Contribution Amount paid by Developer (together with interest eamed <br />thereon) shall be deposited into an escrow account to be withdrawn by County for use in <br />accordance with this agreement as follows: <br />(1) for payment of the design of the Bridge at the time the design <br />contract is let or due to be paid; <br />(2) for the construction of the Bridge as construction occurs and <br />payments become due, provided, however, no construction disbursements shall be <br />made until construction of 53rd Street between the south entrance and 58th Avenue <br />commences; or <br />(3) If both the Bridge and the 53rd Street link between US 1 and 58th <br />Avenue are not placed into service by February 15, 2014, then the County may withdraw <br />the sum of $103,510.00 for the improvement of other transportation infrastructure within <br />{M2075262.}2 <br />C:\Documents and Settings\TRamm\My Documents\wordfiles\Florida\Bayer\North Lake SD -Developer's Agr-final.doc <br />