My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-159
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 1:04:11 PM
Creation date
9/30/2015 7:51:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/06/2004
Control Number
2004-159
Agenda Item Number
11.J.1
Entity Name
Harry and Cecelia Klimas
Albert and Stephanie Klimas
Subject
Off-Site Utilities Oak Island Development Phase III
Area
East side US 1 north of 73rd. St.
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
4178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> 2 . Amendment : <br /> Only a written instrument executed by all parties to the Agreement may modify this Agreement. <br /> 3 . Assignability: <br /> Either party may assign this Agreement. However, the rights granted herein shall run with the land and are <br /> not the personal property of the DEVELOPER. Therefore, while the DEVELOPER has the right under this <br /> Agreement to freely transfer the rights and obligations granted by this Agreement , the assignee shall not have <br /> the right to transfer these rights to another property unless this Agreement is amended in writing by the <br /> assignee and the COUNTY . <br /> 4 . Authority: <br /> Each party hereto represents and warrants to the other that the execution of this Agreement and any other <br /> documents required or necessary to be executed pursuant to the provisions hereof are valid, binding <br /> obligations and is enforceable in accordance with their terms . <br /> 5 . Bidding and Award : <br /> Bid proposals and engineering costs related to the work described herein shall be subject to approval by the <br /> Indian River County Department of Utility Services . The DEVELOPER agrees to use DemandStar to bid the <br /> construction of off-site utilities described herein. The DEVELOPER shall submit to the Department of Utility <br /> Services for review at least three (3 ) bids from licensed and qualified utility contractors. The term "qualified" <br /> shall be as determined by the COUNTY. The COUNTY ' s reimbursement of construction costs to the <br /> DEVELOPER shall be conditioned upon the Utility Services Department ' s approval of project costs . The <br /> DEVELOPER shall not commence work unless the Utility Services Department provides written approval of <br /> the final construction cost. The COUNTY may require redesign and/or re-bid if, in the COUNTY ' s sole <br /> discretion, project costs significantly exceed those contained in Exhibit ` B . " <br /> 6 . Captions : <br /> Captions , if included, in this Agreement are included for convenience only and are not to be considered in any <br /> construction or interpretation of this Agreement or any of its provisions . <br /> 7 . Construction Plans , Technical Specifications and Contract Documents : <br /> The DEVELOPER agrees to complete a final set of construction drawings and make submission for a Utilities <br /> Construction Permit to the Indian River County Utilities Department and Florida Department of <br /> Environmental Protection (FDEP) . The DEVELOPER shall not commence construction until all permits are <br /> approved and obtained . <br /> 8 . Definition <br /> All pronouns shall be deemed to refer to the masculine, feminine , or neuter, singular or plural , as the identity <br /> of the party or parties may require . <br /> 9 . DEVELOPER' s Obligations : <br /> The DEVELOPER shall prepare at its own expense, plans , specifications, Agreement, advertisement, general <br /> conditions , hereinafter referred to as the "contract documents", for the lines and facilities necessary to deliver <br /> the water and wastewater utilities from the COUNTY ' S facilities. All plans and specifications shall be subject <br /> to the COUNTY ' s approval prior to the DEVELOPER' s application. The DEVELOPER shall be responsible <br /> for all costs associated with the design, permitting and construction of the offsite facilities (which includes but <br /> is not limited to transmission lines, valves , fittings, hydrants , meters , and associated appurtenances) whether <br /> designed, permitted or constructed by the DEVELOPER or the COUNTY . <br /> The design, permitting, construction, operation and maintenance of all on-site water and wastewater utilities <br /> which is on or solely dedicated to the DEVELOPER ' s property (including but not limited to water meter, <br /> transmission lines, pumps , valves , storage facilities, etc . ) shall be the DEVELOPER ' s responsibility and <br /> Page 2 of 6 <br /> F:\UTILITIES\UTILITY - ENGINEERING\PROJECTS - UTILITY CONSTRUCTION PERMITS\MULLER HOMES UCP a2300\1)EVELOPERS AGREEMENT - MULLER KLIMAS OFF-SITE UTILITIES JUNE 15, 2004AOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.