My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-009
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 1:34:14 PM
Creation date
10/1/2015 12:51:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/13/2009
Control Number
2009-009
Agenda Item Number
8.E.
Entity Name
OceanGate General Contractors
Subject
Wabasso Beach Park Restoration
Change Order No.1
Area
Wabasso Beach Park
Project Number
0612
Bid Number
2008032
Supplemental fields
SmeadsoftID
7745
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO . 1 i goo 9 _ 0e� y <br /> DATE OF ISSUANCE : EFFECTIVE DATE : <br /> OWNER : Indian River County <br /> CONTRACTOR : OCEAN GATE GENERAL CONTRACTORS INC . <br /> Project: WABASSO BEACH PARK RESTORATION <br /> OWNER' s Bid No . 2008032 OWNER ' s Project No . 0612 <br /> ENGINEER : Indian River County <br /> You are directed to make the following changes in the Contract Documents : <br /> 1 . Description : Sidewalk Revisions : <br /> Reason : Revisions to the sidewalk from that required by the bid documents including <br /> relocation of the crosswalk , addition of required ADA truncated domes , changes in the <br /> maximum allowable slopes , elevations , and locations <br /> ADDITION to the Contract Price = $ 1 , 639 . 60 <br /> 2 . Description : Additional Maintenance of Traffic at the A- 1 -A Park Entrance : <br /> Reason : This was a condition of the County right of way permit that was issued after the <br /> contract award , including cost for installing and maintenance of traffic control items . <br /> ADDITION to the Contract Price = $2 , 200 . 00 <br /> 3 . Description : Furnish and Install Truncated domes at Park Entrance : <br /> Reason : These were not included in the original bid documents , and are an ADA required <br /> feature as per the right of way permits , work includes 200 square feet of domes . <br /> ADDITION to the Contract Price = $6 , 806 . 00 <br /> 4 . Description : Revised Boardwalk Bench and Pickets : : <br /> Reason : The building permit required this item that was not included in the orginal bid <br /> documents . There are 4 benches on the boardwalk , the pickets are required for each to <br /> prevent a child from falling off the boardwalk . <br /> ADDITION to the Contract Price = $898 . 00 <br /> 5 . Description : Revised Pavilion elevations : <br /> Reason : The change in sidewalk slopes and elevations from that required by the original <br /> bid documents required the change in elevation for the pavilions . This cost includes the <br /> addition survey and staking work require for the pavilion changes . <br /> ADDITION to the Contract Price = $345 . 00 <br /> 6 . Description : Door and Frame Finish Revisions : <br /> Reason : The finish for the stainless steel doors and frames was revised and therefore <br /> created a credit for the less expensive finish . <br /> CREDIT to the Contract Price = $ 1 , 000 . 00 <br /> Wabasso Beach Park Restoration <br /> Change Order # 1 - Page 1 of 3 <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\CONSTRUCTION\CHANGE ORDERS\CHANGE ORDER #1 \Change Order <br /> form #1 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.