CHANGE ORDER NO . 1 i goo 9 _ 0e� y <br /> DATE OF ISSUANCE : EFFECTIVE DATE : <br /> OWNER : Indian River County <br /> CONTRACTOR : OCEAN GATE GENERAL CONTRACTORS INC . <br /> Project: WABASSO BEACH PARK RESTORATION <br /> OWNER' s Bid No . 2008032 OWNER ' s Project No . 0612 <br /> ENGINEER : Indian River County <br /> You are directed to make the following changes in the Contract Documents : <br /> 1 . Description : Sidewalk Revisions : <br /> Reason : Revisions to the sidewalk from that required by the bid documents including <br /> relocation of the crosswalk , addition of required ADA truncated domes , changes in the <br /> maximum allowable slopes , elevations , and locations <br /> ADDITION to the Contract Price = $ 1 , 639 . 60 <br /> 2 . Description : Additional Maintenance of Traffic at the A- 1 -A Park Entrance : <br /> Reason : This was a condition of the County right of way permit that was issued after the <br /> contract award , including cost for installing and maintenance of traffic control items . <br /> ADDITION to the Contract Price = $2 , 200 . 00 <br /> 3 . Description : Furnish and Install Truncated domes at Park Entrance : <br /> Reason : These were not included in the original bid documents , and are an ADA required <br /> feature as per the right of way permits , work includes 200 square feet of domes . <br /> ADDITION to the Contract Price = $6 , 806 . 00 <br /> 4 . Description : Revised Boardwalk Bench and Pickets : : <br /> Reason : The building permit required this item that was not included in the orginal bid <br /> documents . There are 4 benches on the boardwalk , the pickets are required for each to <br /> prevent a child from falling off the boardwalk . <br /> ADDITION to the Contract Price = $898 . 00 <br /> 5 . Description : Revised Pavilion elevations : <br /> Reason : The change in sidewalk slopes and elevations from that required by the original <br /> bid documents required the change in elevation for the pavilions . This cost includes the <br /> addition survey and staking work require for the pavilion changes . <br /> ADDITION to the Contract Price = $345 . 00 <br /> 6 . Description : Door and Frame Finish Revisions : <br /> Reason : The finish for the stainless steel doors and frames was revised and therefore <br /> created a credit for the less expensive finish . <br /> CREDIT to the Contract Price = $ 1 , 000 . 00 <br /> Wabasso Beach Park Restoration <br /> Change Order # 1 - Page 1 of 3 <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\CONSTRUCTION\CHANGE ORDERS\CHANGE ORDER #1 \Change Order <br /> form #1 .doc <br />