Laserfiche WebLink
9 / 10 / 2007 <br /> 6 . The surveyor must locate all above-ground fixed improvements and any evidence of underground <br /> fixed improvements within the acquisition parcel . <br /> 7 . Acreage must be determined for each category of land used to determine final purchase price , if <br /> required . Examples of land categories are jurisdictional wetlands , submerged lands if owned by a private <br /> owner and uplands . A closed traverse must be shown on the survey drawing with acreage categories <br /> delineated in order to verify each of the areas . Each individual area of each category of land must have <br /> the acreage written within its boundaries on the survey drawing . The number of decimal places used <br /> should reflect the level of precision for the work performed . <br /> 8 . Easements and rights-of-way, both of record and/or revealed by a field inspection of the acquisition <br /> parcel , must be shown on the drawing and identified by the official record book and page (if recorded ) <br /> and by type of easement . <br /> If an easement or right-of-way for ingress and egress connects the acquisition parcel to a public <br /> right-of-way, it must be protracted and identified by the recorded document's book and page on the <br /> survey drawing . If an access easement or right-of-way does not exist, it must be noted on the survey <br /> drawing that there are no documents in the public records that provide ingress to and egress from the <br /> acquisition parcel to a public right-of-way based upon research of the records by the title company <br /> providing the title insurance . <br /> 9 . Prior to closing the surveyor must review the title insurance commitment for the acquisition parcel . <br /> The survey legal description must match the legal description in the title insurance commitment. If the <br /> legal descriptions do not match , the surveyor must execute an affidavit stating thatthe property conveyed <br /> is the same property described in the commitment. Any referenced encumbrance , except liens , listed in <br /> Schedule B , section II , of the title insurance commitment must be shown with the location , dimensions , <br /> area , and character, and be identified by the book and page of the recorded document on the survey <br /> drawing . <br /> 10 . In areas where the Department of Environmental Protection 's Coastal Construction Control Line <br /> (Chapter 161 , Florida Statutes) has been established , the survey must tie into existing Control Line <br /> monuments . The Control Line and acreage landward of the Control Line must be noted on the survey <br /> drawing . Care should be taken to assure the latest Control Line information is used (Contact Department <br /> of Environmental Protection , Division of Beaches and Shores , 850/487-4475 ). A contact person <br /> may be located on DEP 's website at www. dep . state .fl . us/beaches/. <br /> 11 . The survey must be certified to Florida Communities Trust, unless waived . The date of certification <br /> must be within 90 days before closing , unless waived by Purchaser , FCT , and by the title insurer for <br /> purposes of deleting the standard exceptions for survey matters and easements or claims of easements <br /> not shown in the public records of the title policy. The date in the certification must be revised if the <br /> survey is updated or recertified . <br /> 12 . Drawing must be of appropriate size and must include the legal description of the property. For areas <br /> too large for maximum sheet size , multiple sheets with appropriate match lines must be used . <br /> 13 . The following work products must be submitted to Purchaser; <br /> FCT Survey Procedures <br /> rev. 11/04 . 2 <br />