Laserfiche WebLink
SUMMARY OF BRIDGE PAY ITEMS <br /> PAY ITEM NO . DESCRIPTION UNIT QUANTITY UNIT PRICE (WORDS) UNIT PRICE TOTAL <br /> PRICE <br /> 110-3 Removal of Existing Structures LS 1350 . 1 <br /> 120-5 Channel Excavation CY 614 .0 <br /> 360- 1 Concrete approach slabs EA 2 .0 <br /> 400-2-4 Concrete Class II (Superstructure CY 16 .9 <br /> Sidewalk ) <br /> 400-3-4 Concrete Class III (Superstructure CY 24 . 9 <br /> Closure Pours) <br /> 400-4-5 Concrete Class IV Substructure CY 115 . 1 <br /> 400- 147 Composite Neoprene Pads CF 7 .4 <br /> 400- 148- 1 Traffic Railing F & I Barrier LF 99 .0 <br /> 400- 148-2 Traffic Railing F & I LF 99 .0 <br /> (Sidewalk Type) <br /> 415- 1 -4 Reinforcing Steel (Superstructure ) LB 2430 .0 <br /> 415- 1 -5 Reinforcing Steel Substructure LB 12970 .0 <br /> 450-88- 18 Prestressed Slab Units Traversely SF 4988 . 0 <br /> Post tensioned ( 19") <br /> 455-3-2 Prest Conc Piling Furnished 18" SQ LF 1995 .0 <br /> 455-4-2 Prest Conc Piling Driven 18" SQ) LF 1797 .0 <br /> 455- 17-2 Pile Splices 18" EA 5.0 <br /> 455- 133- 1 Steel Sheet Pilin (Temporary) . SF 2500 .0 <br /> 455- 137 Test Load ( Dynamic) EA 2 .0 <br /> 455- 140- 12 Test Piles Furnished 18" LF 125 .0 <br /> 455- 141 - 12 Test Piles Driven 18" LF 111 .0 <br /> 530-3-4 Ri ra Rubble (Roadway) TN 335 . 0 <br /> ( Ditch Lining ) <br /> 530-74 Bedding Stone TN 240 .0 <br /> BRIDGE SUB -TOTAL COST <br /> _ �Wori Proj�o43\=sal DEW #4 _ <br />