My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-265
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 11:26:26 AM
Creation date
9/30/2015 6:57:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/07/2003
Control Number
2003-265
Agenda Item Number
11.I.2
Entity Name
Sheltra & Sons Construction
Subject
Contract Documents and Specifications Oslo Rd. Improvements
Area
Oslo Rd. and 43rd Ave.
Project Number
9327
Bid Number
5066
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3449
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 5 . Trailer: <br /> a . The frame and tongue shall be all -welded steel construction with protective ' <br /> fenders over the wheels . <br /> ' b . A 2 " ball type hitch and heavy-duty rust resistant safety chains shall be <br /> provided . <br /> c . The trailer axle shall be rated to safely support the sprung weight of the unit <br /> ' while being transported as 65 mph . The trailer shall come equipped with leaf <br /> springs , roller bearings and grease hubs . <br /> d . Two (2 ) 15 inch , minimum load rated " B " tries mounted on one- piece steel <br /> ' wheels shall be provided . <br /> e . The trailer shall be equipped with four adjustable jackstands , one mounted at <br /> ' each corner of the unit . <br /> f. Trailer lights and reflectors shall be in accordance with Federal Motor Vehicle <br /> Safety Standards . <br /> ' g . A trailer light " pigtail " consisting of a 7-pin male connector per SAE J560b <br /> shall be provided . <br /> 6 . Training and Manuals : <br /> a . Two (2 ) manufacturer' s operator manuals and two (2) each lubrication <br /> instructions and maintenance instructions to be delivered with each unit <br /> b . The supplier will provide a checklist for periodic preventive maintenance <br /> suitable for reproduction on 8 '/2 by 11 paper. <br /> c . The suppliershall ensure that all service bulletins , recall notices , and/orother <br /> service or maintenance information for the reasonable life of the machines <br /> ' supplied are sent to the County. <br /> d . The services of a factory technician , thoroughly trained in the use and <br /> operation of the unit, shall be furnished for a period of not less than one ( 1 ) <br /> ' day, to instruct personnel in the use , operation and maintenance of the unit <br /> after delivery . This is to be done at the delivery location . <br /> 7 . Warranty: The manufacturer shall warrant all components , including those not of <br /> ' his manufacture , for a minimum of one year, rust-through for two years . <br /> H . Payment shall be made under: <br /> ' Item No . 102- 1 - Maintenance of Traffic - Lump Sum <br /> Item No . 102- 1 - 1 - Temporary Pavement - Per Square Yard <br /> ' Item No . 102 - 10 - Off Duty Law Enforcement Officer - Man Hour <br /> Item No . 102-70- 11 - Concrete Barrier (Temporary) with Flashing Lights - Linear Foot <br /> Item No . 102-74- 1 - Barricade (Temporary Type ll ) - Each Day <br /> ' Item No . 102-74-2 - Barricade (Temporary Type III ) - Each Day <br /> Item No . 102-99 - Variable Message Sign - Each Day <br /> Item No . 102-99A — Variable Message Sign — Lump Sum <br /> ' TECHNICAL PROVISIONS ADDENDUM N0 . 4 <br /> TP-2 , Page 2 of 2 <br /> ' F :\Public Works\Capital Projects\Oslo - 43rd Avenue\CONTRACT DOCUMENTSWariable Message. Sign.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.