Laserfiche WebLink
IRC Work Order # 1 GK Environmental , Inc. <br /> Oslo Road Boat Ramp <br /> September 8 , 2009 Agenda <br /> Page 4 of 5 <br /> TASK XV — Water Quality AnalVsis <br /> ( $ 1 , 980 . 00 ) <br /> PHASE XV : If necessary , GKE will provide a 24 hour water quality sampling event including : A . M . / <br /> P . M . (dawn / dusk ) sampling for dissolved oxygen , turbidity , salinity , pH , and <br /> temperature , within the impoundment ( impact areas ) and the lagoon . <br /> TOTAL COST $ 395455 . 00 <br /> NOTE 1 : The above costs include additional GKE staff, boat , fuel , and equipment . <br /> NOTE 2 : If required , following permit application submittal and agency review , GKE will <br /> complete any required additional environmental work / meetings . A separate <br /> amendment will be provided if necessary for any additional environmental permitting <br /> assistance costs . <br /> NOTE 3 : Due to the nature of this project , receipt of the State and Federal permits is estimated <br /> to take 12 to 18 months from submittal of a substantially complete permit application . <br /> Services Not Included <br /> The following services / fees are not included ( if required ) in this agreement , but will be <br /> coordinated and reviewed by CONSULTANT : <br /> 1 ) Surveying / engineering <br /> 2 ) Legal work <br /> 3 ) Engineered permit drawings <br /> 4 ) Water quality laboratory analysis ( HBOI ) <br /> COMPENSATION <br /> This section of the AGREEMENT entitled CONSULTANT FEES / COMPENSATION shall be <br /> revised in response to the Scope modifications set out herein . The charges associated with this <br /> AGREEMENT are as follow : <br /> Fees for Environmental Services : <br /> Work on TASKS I through XV $ 39 , 455 . 00 <br /> F : \Engineering \Capital Projects\0381 Oslo Road Boat Ramp\GK Environmental\Work Order No . 1 . doc <br />