My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-226
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2016 11:38:40 AM
Creation date
10/1/2015 3:46:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/08/2009
Control Number
2009-226
Agenda Item Number
8.R.
Entity Name
G.K. Environmental Inc.
Subject
Oslo Boat Ramp Work Order No.1
Project Number
0381
Supplemental fields
SmeadsoftID
10762
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order # 1 GK Environmental , Inc. <br /> Oslo Road Boat Ramp <br /> September 8 , 2009 Agenda <br /> Page 4 of 5 <br /> TASK XV — Water Quality AnalVsis <br /> ( $ 1 , 980 . 00 ) <br /> PHASE XV : If necessary , GKE will provide a 24 hour water quality sampling event including : A . M . / <br /> P . M . (dawn / dusk ) sampling for dissolved oxygen , turbidity , salinity , pH , and <br /> temperature , within the impoundment ( impact areas ) and the lagoon . <br /> TOTAL COST $ 395455 . 00 <br /> NOTE 1 : The above costs include additional GKE staff, boat , fuel , and equipment . <br /> NOTE 2 : If required , following permit application submittal and agency review , GKE will <br /> complete any required additional environmental work / meetings . A separate <br /> amendment will be provided if necessary for any additional environmental permitting <br /> assistance costs . <br /> NOTE 3 : Due to the nature of this project , receipt of the State and Federal permits is estimated <br /> to take 12 to 18 months from submittal of a substantially complete permit application . <br /> Services Not Included <br /> The following services / fees are not included ( if required ) in this agreement , but will be <br /> coordinated and reviewed by CONSULTANT : <br /> 1 ) Surveying / engineering <br /> 2 ) Legal work <br /> 3 ) Engineered permit drawings <br /> 4 ) Water quality laboratory analysis ( HBOI ) <br /> COMPENSATION <br /> This section of the AGREEMENT entitled CONSULTANT FEES / COMPENSATION shall be <br /> revised in response to the Scope modifications set out herein . The charges associated with this <br /> AGREEMENT are as follow : <br /> Fees for Environmental Services : <br /> Work on TASKS I through XV $ 39 , 455 . 00 <br /> F : \Engineering \Capital Projects\0381 Oslo Road Boat Ramp\GK Environmental\Work Order No . 1 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.