Laserfiche WebLink
Drainage Plans <br /> Activity: Drainage Plans <br /> Task Project Project Enviro Analyst Technician Clerical Remarks <br /> Mana or En tneer Prof. <br /> Drainage Analysis 2 nd routin s C�? 20 hrs ar <br /> Oslo Road Phase 11 20 20 <br /> Oslo Road Phase 1 10 10 emolt modification <br /> Not rovided <br /> Pond Sling Report <br /> Field Review <br /> 8 8 site visits <br /> Stormwater Manmeet FacI i 26 12 2 ands 30 hrs per <br /> Oslo Road Phase 1I 4 6 modiiicaiion details <br /> Oslo Road Phase 1 2 4 8 8 <br /> $ 15 1 sheet at 20 hrs per sheet <br /> Summary of Drainage Structures <br /> Drainage Structure Sheets Noi rovided <br /> Oslo Road Phase 11 Not rovided <br /> Oslo Road Phase I Not rovided <br /> 27th Avenue <br /> Stormwater Pollution Prov. Plans5 14 2 sheets at 12 hrs/sht <br /> Oslo Road Phase 11 1 4 <br /> � 5 14 2 sheets at 12 hrs/sht <br /> Oslo Road Phase I 1 <br /> QC/QA 2 <br /> Pro' ect Mann emeni 2 <br /> Subtotal <br /> 12 56 8 79 63 d <br /> Page 4 <br />