Laserfiche WebLink
II. ADDITIONAL SITE AMMENITIES <br />A. <br />Site Lighting <br />Ea. 8 <br />S <br />1,300.00 <br />$ <br />10,400.00 <br />$ 56,588.00 <br />B. <br />Dumpster Enclosure and Gate <br />Ea. 1 <br />$ <br />4,500.00 <br />$ 1,980.00 <br />$ <br />4,500.00 <br />C. <br />30 foot flagpole <br />Ea. I <br />$ <br />3,000.00 <br />$ <br />3,000.00 <br />D. <br />Dunage Bins for Sand, Mulch, Clay, etc. <br />Ea. 4 <br />$ <br />21000.00 <br />$ <br />81000.00 <br />E. <br />Monumental Signage at Streetfront <br />Ea. 1 <br />$ <br />6,000.00 <br />$ <br />65000.00 <br />F. <br />Landscape, Sod, Irrigation System <br />Ea. l <br />$25,000.00 <br />$ <br />25,000.00 <br />IV <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />J. <br />K. <br />L. <br />M. <br />SUB -TOTAL "II"= <br />BUILDING COSTS <br />OFFICE BUILDING 3,500 S.F. @ $135.00/S.F. <br />EQUIP. REPAIR / STOR. BLDG. 1,250 S.F. @ $I 10.00/S.F. <br />GARAGE BUILDING 2,500 S.F. X $60.00 <br />COVERED PATIO 625 S.F. X $38.00/S.F. <br />COVERED WALKWAY 8'W X 44' L @ $25.00/ S.F. <br />CONTINGENCY @ 5% <br />SUB -TOTAL "III" <br />TOTALS I, H, III <br />OTHER COSTS <br />PERMITTING, APPLICATION, TESTING FEES (Paid by Owner) <br />WATER, SEWER & ELECTRIC IMPACT FEES (Paid by Owner) <br />PLAN REVIEW FEES (Paid by Owner) <br />CONNECTION FEES (Paid by Owner) <br />ARCHITECTURAL / STRUCTURAL & MEP ENGINEERING <br />FEES @ 6.68% OF $832,177.00 <br />GEOTECHNICAL TESTING & REPORTS <br />SURVEYING <br />ENVIRONMENTAL INVESTIGATION <br />PRELIMINARY ENGINEERING DESIGN <br />SITE PLANNING <br />FINAL DESIGN AND PERMITTING <br />CONSTRUCTION PHASE SERVICES BY CIVIL ENGINEER <br />17 <br />$ 56,900.00 <br />$472,500.00 <br />$1371500.00 <br />$1505000.00 <br />$ 23,750.00 <br />$ 8,800.00 <br />$ 39,627.00 <br />$832,177.00 <br />$1,187,296.63 <br />TBD <br />TBD <br />TBD <br />TBD <br />$ 56,588.00 <br />$ 2,000.00 <br />$ 15,625.00 <br />$ 1,980.00 <br />$ 5,500.00 <br />$ 4,500.00 <br />$ 121500.00 <br />$ 2,000.00 <br />