Laserfiche WebLink
Update site files, emails, forms, copies, reports to <br /> project manager, photo processing, data <br /> processing, etc. <br /> • Equipment Lease — Monthly Rate <br /> 1 . ISCO 4150 Flowlogger (+ I replacement) $250. 00 <br /> 2 . 3700 Portable Sampler (+ 1 replacement) $250.00 <br /> 3 . Miscellaneous equipment lease : $75.00 <br /> To include : shelters, batteries, site hardware, <br /> wire, PVC, solar panel (if in a remote location) <br /> dessicant, pest control, cleaning agents and <br /> their unlimited replacements during the time <br /> period of this project . <br /> • Miscellaneous Work — Hourly Rate $75.00/hr <br /> To include : surveying, diving, and lab courier (timely <br /> delivery of samples to the lab or to the courier when <br /> required; sample kits can be sent by any reliable shipper <br /> if acceptable by the County' s Project Manager. ) <br /> • Work Not Covered - TBD <br /> Heavy equipment support/operation, ditch/channel <br /> maintenance, any type of aquatic vegetation control, and any/or <br /> work not specified in this proposal . The county will provide <br /> this support (manpower and equipment) when needed . The lab <br /> will perform all required water sample testing (to include ph, <br /> conductivity, temperature, etc . ) <br /> • Total Cost for 1 year, beginning September 1 . 2008 is: <br /> 1) Site Installation - $1750. 00; Site Removal = $875. 00 = $2625. 00. . . Plus <br /> 2) $550(Lease) + $ 700(QA Visits) +$ 75(Lease) + $150(2 Hours Admin) _ <br /> $1475. 00 Monthly X 12 Months = $17, 700. 00 . . . Plus <br /> 3) $450. 00(Autosampling Event Visit) X 7(Rain Events) _ $3150. 00. . . Plus <br /> 4) Total = $2625. 00 + $17, 700. 00 + $3150. 00 = $13, 475. 00 <br /> 5) Total = $23. 475. 00 for 1yea <br /> Signed: —� <br /> Michael Wickwire, VA PhDS, inc. <br /> Signed: <br />