My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-286
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 11:20:48 AM
Creation date
9/30/2015 7:00:51 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transport the HHW stored in the HHW storage building and designated by the District <br /> for removal, to the Contractor' s facilities for disposal . The Contractor shall provide <br /> all labor, equipment and materials necessary for removal, transportation and disposal <br /> of the HHW from the HHW storage building. <br /> 1 . 5 . In the event that a Friday is a holiday, the Contractor shall provide the services <br /> described in Article 1 , Paragraphs 1 , 2 , 3 , and 4 on the weekday immediately <br /> proceeding the holiday. <br /> 1 . 6 . On a Wednesday of the first month following the effective date, the date to be <br /> selected by mutual agreement between the District and the Contractor, the Contractor <br /> shall conduct two 3 -hour sessions of training to SWDD personnel . This training shall <br /> include but not be limited to identification, classification, handling, segregation of <br /> spills and spill clean up of hazardous waste . The Contractor shall repeat the training <br /> annually, during the anniversary month, throughout the term of this Agreement . <br /> 1 . 7 . The Contractor, at the District ' s request, shall also provide hazardous waste <br /> collection, identification, transportation, packaging and disposal for the County' s <br /> Conditionally Exempt Small Quantity Generators (CESQG) and small quantity <br /> generators (SQG) . <br /> 1 . 7. 1 Upon startup of the CESQG waste program, the Contractor shall accept <br /> hazardous waste from CESQG ' s at the District ' s location. CESQG ' s are <br /> defined as generators, which generate less than 220 pounds of hazardous waste <br /> per month. The Contractor shall identify, consolidate, lab pack, package, <br /> manifest, transport and disposed of all of the CESQG wastes received during <br /> the event . The Contractor shall collect the costs associated with CESQG waste <br /> collection and disposal from the CESQG which delivers the waste . The <br /> Contractor shall offer the CESQG ' s the same fee for the services as outlined in <br /> this Agreement. The Contractor shall assume ownership of the waste upon <br /> transfer to the Contractor. The contractor may store CESQG wastes at the <br /> District ' s facility and must remove these waste upon completion of the <br /> collection event unless their storage is specifically allowed by the District. The <br /> Contractor assumes all responsibility in the performance of any activities <br /> connected with the collection and disposal of CESQG wastes . <br /> 1 . 7.2 Upon start up of the Small Quantity Generators program the Contractor shall <br /> during the term of this Agreement, offer the service of collection of wastes <br /> from the District ' s Small Quantity Generators . The District shall supply the <br /> Contractor with a mailing list or SQG ' s and CESQG ' s prior to the start of the <br /> program. The Contractor may establish milk runs or small quantity collection <br /> schemes in order to provide economical transportation and disposal costs for <br /> the District ' s SQG ' s . The cost for disposal of the District ' s SQG wastes shall <br /> be paid by the SQG and the Contractor shall be responsible for the collection <br /> of funds from the SQG. The SQG shall be charged a rate for disposal as set <br /> forth in this Agreement. <br /> 1 . 8 ._ Within 30 days of completion of the household hazardous waste removed for <br /> disposal, the Contractor shall provide the District with the following reports : (a) All <br /> Disposal : The Contractor shall match the quantities of material received with the <br /> resultant containers which the Contractor placed the received material into for <br /> disposal. The report shall list the hazard class of the container or lab pack as in <br />
The URL can be used to link to this page
Your browser does not support the video tag.