Laserfiche WebLink
EXHIBIT "A" <br /> POINTE WEST SOUTH VILAGE PHASE 1 <br /> POINTE WEST SOUTH VILLAGE PHASE 1 <br /> ITEM DESCRIPTION PAGE 3 UNIT QUANTITY UNIT $ EXTENTION % COMP. $ COMP. BAL. TO <br /> COMPLETE <br /> MISC. <br /> M1 P .V. C . 2" L. F. 3,000 $ 3. 75 $ 11 , 250. 00 100% $ 11 , 250. 00 $ <br /> M4 P .V. C . 2" (INSTALL ONLY) L. F . 51000 $ 2 . 50 $ 12, 500.00 100% $ 12 , 500. 00 $ - <br /> M3 MAINT. BOND UTILITIES 25% L. S . 1 $ 21725. 00 $ 2, 725. 00 0% $ - $ 2, 725.00 <br /> M4 ELECTRIC SERVICE INSTALL EACH 66 . $ 367 .00 $ 24, 222 . 00 0% $ - $ 24, 222 . 00 <br /> SUB-TOTAL $ 50,697.00 $ 23,750.00 $ 269947.00 <br /> TOTAL $ 870,630.89 $ 494,408.04 $ 376x222.85 <br /> ENGINEERINNG $ 2 , 500. 00 <br /> SURVEYING $ 51000. 00 <br /> GRAND TOTAL $ 383,722.85 <br /> BOND 115% $ 441 ,281 .28 <br /> BASED ON THE CONTRACT WITH SPS CONTRACTING AND OUR INSPECTION OF THE STATUS OF THE WORK <br /> COMPLETED TO DATE , WE HEREBY CERTIFY THE ABOVE FIGURE IS COST TO COMPLETE THE ABOVE <br /> OUTLINE QUIRED IMPROVEMENTS . <br /> J, I , PE DATE: <br /> iepoww <br /> 000 <br /> 8/9/2004 NV TWCVIV-SV QUANTITIES SPS. xls SV-I BOND <br />