My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-235
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 1:37:30 PM
Creation date
10/1/2015 12:26:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/15/2008
Control Number
2008-235
Agenda Item Number
12.J.4
Entity Name
Poole and Kent Company of Florida
Subject
North County Water Treatment Plant Expansion Change Order No.4
Area
North County Water Treatment Plant
Project Number
6706-43025-155
Supplemental fields
SmeadsoftID
7502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Number 4 Summary <br /> Indian River CountyNorth County Water Treatment Plant Expansion Phase II <br /> Potential <br /> Change <br /> Order <br /> number Description Amount Explanation <br /> 44 Two raised sand filter access platforms $16 ,954 . 00 The sand filters are raised above the ground limiting access to the <br /> mechanical parts located at the top of the filter, Operator safety and <br /> accessibility for maintain the $ 185,400 piece of equipment are the <br /> primary reasons for this change. 11 <br /> 45 Instrumentation Remote Input/Output Panel $46 , 275 .00 This change is to provide additional wiring , conduits , and input and <br /> output cards for the existing plant 1/0 cabinets along with Surge <br /> protection , <br /> 46 Differential Pressure Guages $30590 .00 This change upgrade the differential pressure guages to a higher <br /> quality internal parts . <br /> 49 Credit for Surplus Fuel ($25 , 000 . 00) The project specifications require the contractor to provide two full fuel <br /> tanks at the completion of the project which is not necessary since the <br /> contractor will supply the other tank of fuel. <br /> 51 Credit for not removing membranes from Skids (361363.00) IRC was planning to replace the Reverse Osmosis membranes in <br /> 1 & 2 Skids 1 & 2 . However since they are still performing well, the <br /> membranes will now be installed in skids 6 & 7. The contractor is <br /> providing a credit for the removal of the membranes that will now not <br /> be performed . This change provides the plant with the flexibility to <br /> produce water from two additional skids and reduce the overall cost o <br /> the project. <br /> 53 Handrail on Acid Containment Structure $ 11 ,380 .00 The sulfuric acid tank has a spill containment structure around the <br /> tank . IRC staff asked that a handrail be installed for fall protection . <br /> 54 Truck Loading Panel for Sodium Hypochlorite $3,900.00 This change is for additional electrical conduits to connect two truck <br /> loading panels for the liquid sodium hypochlorite tanks . This is a <br /> change required to prevent overfilling of the tanks and spilling into the <br /> containment. <br /> 56 Chlorine Piping Changes $ 11 ,200. 00 This change provides additional chemical piping to allow more precise <br /> dosing of the plant odor control equipment . This change provides <br /> greater plant operating flexibility and potential for chemical cost <br /> savings over the life of the project . <br /> Total Amount Change Order No. 4 $61 ,936.00 <br /> Original Contract Price $21 ,080,300,00 <br /> Change Order Number 1 ($ 804,632.00) <br /> Change Order Number 2 $ 2889824.00 <br /> Change Order Number 3 $ 200,527.00 <br /> Change Order Number 4 $61 ,936.00 <br /> Total Contract Price $20,826,956.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.