Change Order Number 4 Summary <br /> Indian River CountyNorth County Water Treatment Plant Expansion Phase II <br /> Potential <br /> Change <br /> Order <br /> number Description Amount Explanation <br /> 44 Two raised sand filter access platforms $16 ,954 . 00 The sand filters are raised above the ground limiting access to the <br /> mechanical parts located at the top of the filter, Operator safety and <br /> accessibility for maintain the $ 185,400 piece of equipment are the <br /> primary reasons for this change. 11 <br /> 45 Instrumentation Remote Input/Output Panel $46 , 275 .00 This change is to provide additional wiring , conduits , and input and <br /> output cards for the existing plant 1/0 cabinets along with Surge <br /> protection , <br /> 46 Differential Pressure Guages $30590 .00 This change upgrade the differential pressure guages to a higher <br /> quality internal parts . <br /> 49 Credit for Surplus Fuel ($25 , 000 . 00) The project specifications require the contractor to provide two full fuel <br /> tanks at the completion of the project which is not necessary since the <br /> contractor will supply the other tank of fuel. <br /> 51 Credit for not removing membranes from Skids (361363.00) IRC was planning to replace the Reverse Osmosis membranes in <br /> 1 & 2 Skids 1 & 2 . However since they are still performing well, the <br /> membranes will now be installed in skids 6 & 7. The contractor is <br /> providing a credit for the removal of the membranes that will now not <br /> be performed . This change provides the plant with the flexibility to <br /> produce water from two additional skids and reduce the overall cost o <br /> the project. <br /> 53 Handrail on Acid Containment Structure $ 11 ,380 .00 The sulfuric acid tank has a spill containment structure around the <br /> tank . IRC staff asked that a handrail be installed for fall protection . <br /> 54 Truck Loading Panel for Sodium Hypochlorite $3,900.00 This change is for additional electrical conduits to connect two truck <br /> loading panels for the liquid sodium hypochlorite tanks . This is a <br /> change required to prevent overfilling of the tanks and spilling into the <br /> containment. <br /> 56 Chlorine Piping Changes $ 11 ,200. 00 This change provides additional chemical piping to allow more precise <br /> dosing of the plant odor control equipment . This change provides <br /> greater plant operating flexibility and potential for chemical cost <br /> savings over the life of the project . <br /> Total Amount Change Order No. 4 $61 ,936.00 <br /> Original Contract Price $21 ,080,300,00 <br /> Change Order Number 1 ($ 804,632.00) <br /> Change Order Number 2 $ 2889824.00 <br /> Change Order Number 3 $ 200,527.00 <br /> Change Order Number 4 $61 ,936.00 <br /> Total Contract Price $20,826,956.00 <br />