Laserfiche WebLink
t <br /> • removal of Sheet H- 1 (HVAC drawing associated with the well house) <br /> • removal of references to "well houses" throughout contract drawings <br /> • add fence detail to Sheet C- 1 <br /> • remove well house and add control panel detail to Sheet E- 1 <br /> • revise electrical layout on sheets E-2 and E-3 ; remove reference to intruder alarms <br /> • revise instrumentation sheets ( 1 -0 and 1 - 1 ) to reflect changes to alarms <br /> Task 2- Revised Specifications <br /> This task includes revising the specifications to reflect the changes identified on the plans, including the <br /> removal of the well houses and directional drill of 58`h Street . <br /> Task 3 - Pre - bid Services <br /> This task includes attendance at one pre- bid meeting, responses to request for information from bidders, <br /> and maintaining a bidders ' list . <br /> Task 4- Bidding Services <br /> This task includes attendance at the bid opening, preparation of a bid tabulation and reviewing the bids to <br /> identify the lowest responsive, responsible bidder. <br /> B . Request For Additional Information Number 5 - St . Johns River Water Management District <br /> The following scope of services is proposed to complete the RAI # 5 Response Submittal identified above : <br /> Task 1 - Initial "Teleconference with District Staff <br /> This task includes an initial teleconference with District staff, to identify the specific modeling needs <br /> requested in Question 1 , items a through e of the May 28 , 2009 RAI # 5 letter . <br /> Task 2 - Model Recalibration (Question La . , I . b . , I . c . l . d . ) <br /> This task includes recalibrating the Indian River County model to the average water level observations for <br /> the calibration year ( 1993 / 1994) relative to simulated levels . This task includes the provision of layer-by- <br /> layer statistics for correlation between observations and simulated values, per the District ' s request La . <br /> and b . of the May 28 , 2009 RAI . Further, the items requested in items 1 . c and l . d (detailed analyses of <br /> model fluxes, GHB conductance , calculation methodology and average evapotranspiration extension <br /> depth will also be completed as part of this task . <br /> Task 3 - Identification of Vero Beach pumping ( Question 1 . e) <br /> The original model included the pump rates as provided by the District . This task includes that the data <br /> provided by the District included the City of Vero Beach ' s pumping rates . If not, this task includes <br /> obtaining same from the District and incorporating into the model . The budget is predicated on the <br /> information not being present and a request and subsequent inclusion of the data being made . <br /> Task 4- Reporting <br /> This task includes preparation and submittal of a Technical Memorandum , which will provide responses <br /> to the RAI 5 Questions l . a through Le, and preparing revisions to update the model documentation report <br /> that was provided on as a PDF file on DVD in the response submittal to RAI #4 . This task does not <br /> include reformatting the report, but rather the expansion and/ or replacement of key sections to illustrate <br /> the re-calibrated model . <br /> 3 <br />