Laserfiche WebLink
EXIHIBIT A <br /> Division 8—Doors and Windows <br /> 1. Site 2—The finish on overhead coiling doors has been changed from a powder coat finish <br /> to a standard prime finish. <br /> 2. Site 2—The finish on overhead coiling door guides has been changed from galvanized <br /> finish to standard prime. <br /> 3. Aluminum storefronts to be dark bronze anodized per request for information(RFI) 4/1. <br /> Division 9—Finishes <br /> 1. No access panels are seen in plans for drywall or plywood ceilings. <br /> 2. The rigid insulation on exterior walls has been changes to batt insulation. <br /> 3. The ceramic tile for both sites has been changed from a porcelain tile to a standard <br /> ceramic tile. The wall tile will also be reduced to 4' from finish floor. GMP reflects base <br /> drawings. <br /> 4. The ceramic floor tiles has been changed from a 6"x 6"porcelain to a 12"x 12" standard <br /> ceramic tile. <br /> Division 10—Specialties <br /> 1. Visual display boards are listed in specifications, but cannot be found in plans. Display <br /> Boards are not included in Contract. <br /> 2. PCC has not been able to locate any fire extinguishers on plans. There is a $6000.00 <br /> allowance for this item. <br /> 3. Window treatments are not included in this Contract. <br /> Division 11 —Equipment <br /> 1. PCC has not been able to locate any projection screens on plans. There is a$1000.00 <br /> allowance for this item. <br /> Division 12—Furnishings <br /> Non-Applicable <br /> Division 13—Special Construction <br /> 12/3/02 Page 5 of 7 <br />