Laserfiche WebLink
EXHIBT A <br /> (3 ) Project Approval : Approval of projects by the District shall be in accordance <br /> with these rules . <br /> (4) Project Accessibility : Facilities or programs funded in whole or in part by <br /> program funds shall be made available to the general public of all of the member counties <br /> on a non-exclusive basis without regard to race, color, religion, age , sex or similar <br /> condition. Additionally, facilities funded in whole or in part by program funds, shall not <br /> require a paid membership for the general public of all of the member counties as a <br /> condition to use the facilities . User or entrance fees may be charged for the use of <br /> facilities funded in whole or in part by program funds , however such fees shall be <br /> reasonable and shall be the same for the general public of all of the member counties . <br /> (5 ) Waterway Impacts : All development projects must be designed so as not to <br /> impact navigation along the District's waterways through the placement of structures, <br /> attendant uses , or the necessity of a boating speed zone for safety purposes . Before <br /> applying for boating speed zone designation in District waterways because of a project <br /> funded by this program, the sponsor shall first receive approval from the Board . The <br /> Board will use the criteria found in s . 327 . 46( 1 ) , F . S . , in determining whether to approve <br /> the proposed boating speed zone . <br /> (6) Project Maintenance : The project sponsor shall be responsible for the <br /> operation, maintenance , and management of the project for the anticipated life of the <br /> project and shall be responsible for all expenses required for such purposes . The project <br /> shall be maintained in accordance with the standards of maintenance for other similar <br /> local facilities and in accordance with applicable health standards . Project facilities and <br /> improvements shall be kept reasonably safe and in reasonable repair to prevent undue <br /> deterioration and to encourage public use . The project sponsor shall have full legal <br /> authority and financial ability to operate and maintain the project facilities . <br /> (7) Public Information Availability : Public information produced with assistance <br /> from this program shall not be copyrighted and shall be provided free of cost, except for <br /> the cost of reproduction, to the public . <br /> (8) Third-Party Project Operators : Projects that are being operated by a third party <br /> shall have sufficient oversight by the eligible project sponsor as determined by the Board . <br /> Such oversight, at a minimum, will include a project liaison that is a staff member of the <br /> 6 <br />