My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-329
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:51:42 PM
Creation date
9/30/2015 10:04:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Proposal
Approved Date
09/25/2006
Control Number
2006-329
Agenda Item Number
Administrator's signature
Entity Name
Ardaman & Associates, Inc.
Subject
Proposal for subsurface soil exploration-20th Ave SW improvements
Area
Between 17th PL SW and 25th St. SW
Supplemental fields
SmeadsoftID
5840
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Engineering Division <br /> Proposal File No . 06-64-3054 -2- <br /> We recommend that the project surveyor locate our borings horizontally and vertically (i . e . ; <br /> determine the elevation of the ground surface at the boring locations) . This information will <br /> increase the accuracy of the data obtained and will be especially useful in estimating the normal <br /> seasonal high groundwater table . <br /> LABORATORY TESTING <br /> Routine laboratory visual classification will be performed along with specific classification tests <br /> deemed necessary ( i . e . , sieve analysis , Atterberg limits and organic contents) . <br /> ENGINEERING ANALYSIS AND REPORT <br /> Engineering analysis of all data obtained will be made to evaluate general subsurface conditions <br /> and to develop general engineering recommendations . Our findings together with all data <br /> developed during the exploration , will be submitted in a written report upon conclusion of the study. <br /> We will provide a discussion of the encountered soil types and recommendations to guide site <br /> preparation and roadway construction as they relate to the proposed roadway improvements. If <br /> unsuitable material (i . e. organic muck) is encountered during performance of the borings , we will <br /> provide recommendations to guide removal and replacement of such material with suitable and <br /> compacted fine sand soils within the project limits. <br /> SCHEDULE <br /> Based on our current work schedule , we can begin with in 1 to 2 days upon receiving written <br /> authorization to proceed . We anticipated the field work will require approximately 1 to 2 weeks to <br /> complete . The actual duration of the project, however, will depend on the progress of the drilling <br /> and laboratory testing . Our report will be prepared and issued within approximately one week <br /> following completion of the field and laboratory programs. <br /> COST ESTIMATE <br /> The cost associated with the aforementioned tasks is summarized below. Unit rates were obtained <br /> from the continuing service contract between Indian River County and Ardaman & Associates , Inc. <br /> This cost will not be exceeded without prior authorization from the client. <br /> 1 . Project Coordination , Initial Site Reconnaissance , Layout of Boring Locations , and <br /> Coordination of Locating Underground Utilities : <br /> • Project Engineer - 2 hour @ $85 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . $ 170 . 00 <br /> • Senior Field Technician - 6 hours @ $48 . 00/hour . . . . . . . . . . . . . . . . . . . . $ 288 . 00 <br /> 2 . Solid -Stem/Hand ( Bucket) Auger Borings : <br /> 192 feet of auger boreholes @ $7 . 50/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 ,440 <br />. 00 <br /> 60 feet of auger boreholes (as needed for limits of unsuitables) @ $7 . 50/foot $ 450. 00 <br /> Ardaman & Associates, Inc. <br /> 1111111111110% <br />
The URL can be used to link to this page
Your browser does not support the video tag.