My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-266
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 1:46:33 PM
Creation date
10/1/2015 12:31:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/22/2008
Control Number
2008-266
Agenda Item Number
None
Entity Name
Florida Department of Transportation
Subject
Original agreement and authorizing Resolution 2006-097
Railroad Reimbursement Agreement
Area
16th St./17th St.
Archived Roll/Disk#
4013
Supplemental fields
SmeadsoftID
7544
Document Relationships
2006-097
(Attachment)
Path:
\Resolutions\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be $ 132 , 496 . 00 as shown on the estimates for crossing installation attached hereto as Exhibit B <br /> and incorporated by reference . When the RAILWAY determines that the replacement of the new <br /> SURFACE is more economical than its continued maintenance , the RAILWAY shall have the <br /> exclusive option to replace the SURFACE with a comparable or improved structure . The <br /> replacement costs of the new SURFACE shall be the sole responsibility of the COUNTY . The <br /> COUNTY shall, at its sole expense , maintain and replace the remainder of the road inside the <br /> RAILWAY' S right-of-way, plus any paving which may be located between the ends of the ties . <br /> The RAILWAY shall provide a construction watchman at said CROSSING SITE while work is <br /> being performed by the COUNTY under the provisions of this Agreement, at the sole expense of <br /> the COUNTY. <br /> 9 . The COUNTY agrees, acknowledges and understands that the RAILWAY reserves <br /> the right to make any changes at any future time in its existing tracks or other facilities, including <br /> the installation, maintenance and operation of any additional track or tracks or other facilities on <br /> its right-of-way at the CROSSING SITE . The COUNTY agrees to bear the total expense of any <br /> changes or additions to the pavement and traffic signal devices , the SURFACE , the WARNING <br /> DEVICES or other railroad signalization equipment or new structure at the CROSSING SITE, <br /> whether these changes or additions are required by law or order of any public or judicial <br /> authority, done voluntarily by the RAILWAY, or requested by the COUNTY . <br /> 10 . The COUNTY agrees that it will install, maintain and replace all necessary drainage <br /> facilities to prevent the accumulation of surface water due to the existence of the CROSSING <br /> SITE . Such facilities must first be approved by the RAILWAY and any governing bodies having <br /> jurisdiction thereof and operation of the facilities shall also be subject at all time to <br /> their <br /> approval . An additional license agreement may be required by the RAILWAY , depending upon <br /> XFrm0499 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.