Laserfiche WebLink
1 1 <br />II 1 1 <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />WORK DESCRIPTION 725.ON-07 <br />GRADE CROSSING RAIL <br />NEW OR RECONSTRUCTION 'ow <br />A. <br />B. <br />C. <br />D. <br />E. <br />F <br />RAILROAD COMPANY <br />Florida Esat Coast Railway L.L.C. <br />JOB DESCRIPTION & LOCATION: Widen the existing grade crossing - Vero Beach <br />TYPE OF ROADWAY FACILITY: Four -lane divided - Urban <br />FDOT/AAR XING NO.: 272195=P RR MILE POST TIE: 228 + 118' <br />TYPE CROSSING PROPOSED: "T" Concrete Modified DOT INDEX: 560 <br />STATUS AND PROPOSAL: <br />1. EXISTING CROSSING (See Agreement dated 7/21/1982 _ ) <br />a. X To be improved as permanent public road crossing. <br />b. To be (used4mproved) for temporary (haul -detour) operation, Pit. No. <br />c. To be relocated (See above for new location) Existing crossing will: <br />(1) remain in place for local use. <br />(2) be abandoned and removed by (State -Railroad) forces. <br />d. To be eliminated - Remarks <br />2. NEW CROSSING <br />a. <br />b. <br />C. <br />d. <br />To be constructed as permanent public road crossing. <br />To be constructed for temporary (hauWetour) operation, Pit No. <br />Relocated from elsewhere (See 1.c. above, Re: Existing Crossing). <br />Requires Public Hearing (State Statute 335.141 & 120.57) <br />VERTICAL ALIGNMENT: <br />1. X Meeting elevation of existing rails. <br />2. Track adjustments necessary. Rails to be (raised -lowered) <br />feet. <br />G. CROSSING PROTECTION: (Signal Sheet attached: O Yes OO No.) <br />H. DRAINAGE ITEMS: (Drainage Sheet attached: O Yes No.) <br />I. COMMUNICATION AND/OR POWER LINE ADJUSTMENTS <br />1. X By Others (FDOT or Contractor Company.) <br />2. By Railroad Company. <br />J. AUTHORITY REQUESTED: (Draft attached: O Yes O No.) <br />1. X Agreement (Third Party Participating Indian River County ) <br />2. Supplemental Agreement No. <br />3. Crossing Permit. <br />4. Estimate for Change Osier No. <br />5. Letter of Authority. <br />6. Letter of Confirmation (No Cost to Department). <br />K. OTHER REMARKS: Negotiations to be completed by <br />