Laserfiche WebLink
1 1 <br /> II 1 1 <br /> STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br /> WORK DESCRIPTION 725.ON-07 <br /> GRADE CROSSING RAIL <br /> NEW OR RECONSTRUCTION ' ow <br /> FINANCIAL PROJECT NO. ROAD NAME OR NUMBER COUNTY NAME PARCEL & RNV NUMBER FAP NUMBER <br /> 23087215701 16th St. / 17th St. INDIAN RIVER 71 (2150) <br /> RAILROAD COMPANY <br /> Florida Esat Coast Railway L . L. C . <br /> A. JOB DESCRIPTION & LOCATION: Widen the existing grade crossing - Vero Beach <br /> B. TYPE OF ROADWAY FACILITY: Four-lane divided - Urban <br /> C. FDOT/AAR XING NO. : 272195=P RR MILE POST TIE: 228 + 118' <br /> D. TYPE CROSSING PROPOSED: "T" Concrete Modified DOT INDEX: 560 <br /> E. STATUS AND PROPOSAL: <br /> 1 . EXISTING CROSSING (See Agreement dated 7/21 /1982 _ ) <br /> a. X To be improved as permanent public road crossing . <br /> b. To be (used4mproved) for temporary (haul-detour) operation , Pit. No. <br /> c. To be relocated (See above for new location) Existing crossing will: <br /> ( 1 ) remain in place for local use. <br /> (2) be abandoned and removed by (State-Railroad) forces. <br /> d . To be eliminated - Remarks <br /> 2. NEW CROSSING <br /> a . To be constructed as permanent public road crossing. <br /> b. To be constructed for temporary (hauWetour) operation, Pit No. <br /> c. Relocated from elsewhere (See 1 .c. above, Re : Existing Crossing). <br /> d. Requires Public Hearing (State Statute 335 . 141 & 120. 57 ) <br /> F. VERTICAL ALIGNMENT: <br /> 1 . X Meeting elevation of existing rails. <br /> 2. Track adjustments necessary. Rails to be (raised-lowered) feet. <br /> G . CROSSING PROTECTION: (Signal Sheet attached: O Yes OO No. ) <br /> H . DRAINAGE ITEMS: (Drainage Sheet attached: O Yes No . ) <br /> 1 . COMMUNICATION AND/OR POWER LINE ADJUSTMENTS <br /> 1 . X By Others ( FDOT or Contractor Company. ) <br /> 2. By Railroad Company. <br /> J. AUTHORITY REQUESTED: (Draft attached: O Yes O No. ) <br /> 1 . X Agreement (Third Party Participating Indian River County ) <br /> 2. Supplemental Agreement No. <br /> 3. Crossing Permit. <br /> 4. Estimate for Change Order No. <br /> 5. Letter of Authority. <br /> 6. Letter of Confirmation (No Cost to Department). <br /> K. OTHER REMARKS: Negotiations to be completed by <br />