Laserfiche WebLink
DESCRIPTION OF PROJECT OR USE OF SECONDARY ROAD FUNDS FOR 1965-46 . <br />1. To complete survey and alignment map for Indian River <br />Boulevard from Township lino dividing 31 South. and 32 <br />South, to Oslo Road, approximately 10.0 miles. <br />2. Ranch Road, (82nd Avenue) from SR 60 to Oslo Road SR 606 <br />and Oslo Road from Rangeline to Ranch Road, approximately <br />4.5 mils. <br />3. Widening and reconstruction of the Old Dixie -Highway frac <br />19th Street to SR 612, Glendale Road, and the paving of <br />14th Avon** 1rom.16th Street to the Old Dixie Highway, <br />approximately 1.75 miles. <br />4. 16th Street, from =manna Avenue SR 611 to Rings Highway, <br />Sit 5054, approximately 1 mile. <br />5. Glendale Road, SR 612. from Rings Highway 8R 5054, to Ditch <br />D-4 (or 90th Avenue), approximately 4 miles. <br />6. CU:maans Avenue, OR 611 from SR 60 to walker AveaUS including <br />bridge over Main canal, approximately 0.5 mile. <br />7. Rework bane. widon and resurface Lateral A, 8R 505, from <br />South Gifford Road. SR 630, to SR 60, approximately 2 miles. <br />e. Rework base. widen and resurface Kings Highway, SR 505 -AA from <br />South Gifford Road, 8R 630, to SR 60, approximately 2 miles. <br />9. Citrus Road (4th Street) from RRmarson Avenue, SR 607 to pings <br />Righway. SR 5054, approximately 2 miles. <br />10. Renck Road. SR 609. from SR 60 to Borth Gifford Road, approxi.. <br />stately 211 miles. <br />11. Borth Gifford Road from Lateral A. 9R 50S to Ranch Road, SR <br />607. approximately 2 miles. . <br />12. Require additional right of way, reconstruct and widen *EMI= <br />Avenue. SR 607 from OR 60 to Glendale Road. SR 612, approniostely <br />3iy miles. <br />• soot rAct167 <br />MAK 101965 <br />