Laserfiche WebLink
SECTION 02050 <br /> DRILLING <br /> 1 .0 GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . Work included in this section includes all equipment, personnel and materials to <br /> complete mud rotary and reverse-air drilling operations as specified in these <br /> documents and as shown on the Drawings . <br /> B . The work described herein consists of drilling and testing four 16-inch diameter <br /> production wells completed into the Upper Floridan Aquifer ( UFA) in accordance with <br /> these specifications in the location and in the manner shown on the Drawings . <br /> C . The principal purpose of the work is to install three production wells to augment the <br /> existing wellfield. <br /> D . The construction of the well must be performed by a State of Florida licensed Water <br /> Well CONTRACTOR, and the well must meet all standards set by the Florida <br /> Department of Environmental Protection ( FDEP), the Saint Johns River Water <br /> Management District (SJRWMD), the American Water Works Association (AWWA), <br /> Indian River County Public Health Department (SCPHD) and Indian River County <br /> codes. <br /> E. The drilling CONTRACTOR shall be responsible for providing to the OWNERS/ <br /> ENGINEERS proof of all secured permits and operating licenses as required by local <br /> and state agencies . No construction may begin until such permits are obtained. <br /> 2.0 PRODUCTS <br /> 2 .01 PERSONNEL <br /> A . The CONTRACTOR shall provide the services of an environmental testing laboratory <br /> to analyze air-lift water samples . The laboratory must be certified by the Florida <br /> Department of Health and Rehabilitative Services in accordance with Chapter 64E- 1 , <br /> F . A .C . At the time he submits his bid, the CONTRACTOR must provide (for <br /> ENGINEERS approval) the name, address, and certification number of the testing <br /> laboratory that he will use. <br /> B . The CONTRACTOR shall furnish capable personnel and equipment to construct the <br /> wells as specified. The work shall be performed with equipment that is adequate to <br /> perform all phases of well construction . The bidder shall submit with his bid <br /> DRILLING <br /> 02050- 1 <br /> C:\DOCUME— I \mikeh\LOCALS— I \Temp\Temporary Directory 13 for IRC wells Div I .Ap\064IRC_DRFLUNG.DOC <br />