My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02080 <br /> CASING <br /> I .0 GENERAL <br /> 1 . 1 Scope of Work <br /> 1 . 1 . 1 The work included in this section covers the work, materials , labor <br /> and equipment necessary for joining and installing the casing as <br /> specified. <br /> 2.0 PRODUCTS <br /> 2 . 1 Personnel <br /> 2 . 1 . 1 The CONTRACTOR shall furnish capable personnel including <br /> certified welders where required to join, install , and test the casings <br /> as specified. <br /> 2 . 2 Equipment <br /> 2 .2 . 1 The CONTRACTOR shall provide appropriate equipment capable <br /> of joining and installing the casings as specified. <br /> 2 .3 General <br /> 2 . 3 . 1 All casing will be new and unused casing free from defects in <br /> materials, workmanship and handling. <br /> 2 . 3 .2 Mill certificates or equivalent for all casing material used shall be <br /> provided by the CONTRACTOR and approved by the ENGINEER <br /> prior to installation . <br /> 2 .4 Pit Casing - Optional <br /> 2 .4 . 1 Installation of pit casing is at the CONTRACTOR ' s option . <br /> 2 .4 .2 Use pipe of sufficient strength to hold the drilled hole open until <br /> grouting is completed. The depth of the pit casing will be dictated <br /> by site geology. <br /> 2 .4 . 3 The diameter, wall thickness, and positioning of the pit casings <br /> shall be selected by the CONTRACTOR and shall in no way <br /> interfere with specified construction of the remainder of the well . <br /> CASING <br /> 02080- 1 <br /> C :\DOCUME— I \mikeh\LOCALS-1 \Temp\TempomryDirectory 15 for IRC wells Div Lzip\07-TRC_Casing.doc <br /> 10/ 17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.