My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
centralizers will be placed at 20 feet above the bottom of the casing <br /> and every 60 feet thereafter with the final centralizers placed at 20 <br /> feet below the top of the casing. <br /> 3.0 EXECUTION <br /> 3 . 1 General <br /> 3 . 1 . 1 All casing shall be installed by a method appropriate for the <br /> specified task order, as selected by the CONTRACTOR and <br /> approved by the ENGINEER . <br /> 3 . 1 .2 The CONTRACTOR will provide the ENGINEER with welder <br /> certificates before any welding operations are initiated. <br /> 3 . 1 . 3 If casing is welded, the standards of the American Welding Society <br /> shall apply. All welds shall be fully penetrating. <br /> 3 . 1 .4 Casing lengths shall be joined watertight by a method appropriate <br /> to the material used, as selected by the CONTRACTOR and <br /> approved by the ENGINEER so that the resulting joint shall have <br /> the same structural integrity as the casing itself. <br /> 3 . 1 . 5 All casing shall be installed as near to plumb and straight as <br /> possible . Following the installation of the final casing and prior to <br /> cementing, the entire casing string will be rotated by hand to <br /> demonstrate the casing is aligned plumb within the borehole . <br /> 3 . 1 . 6 Any casing, which fails, collapses or separates during installation <br /> shall be removed from the hole and repaired or replaced at the <br /> CONTRACTOR' s sole expense. <br /> 3 . 2 Straightness and Plumbness Test <br /> 3 . 2 . 1 If, in the opinion of the ENGINEER, there is reasonable doubt <br /> about the plumbness and/or alignment of the well , the <br /> CONTRACTOR shall perform the plumbness and alignment test <br /> described in Appendix C of AW WA A100-97 at his expense . The <br /> test for plumbness and alignment shall be made following <br /> construction of the well and before pump equipment is installed. <br /> 3 . 3 Straightness and Plumbness Requirements <br /> Should the test data show that a 12-inch diameter pump cannot be set in <br /> the well to a depth of 200 feet without bending or should the well vary <br /> from plumb in excess of 2/3 the inside diameter of the 16 -inch diameter <br /> CASING <br /> 02080-3 <br /> CADOCUME-1 \mikeh\LOCALS— I \Temp\Temporary Directory 15 for IRC wells Div l .zip\07-IRC_Casing.doc <br /> 10/ 17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.