My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02150 <br /> GEOPHYSICAL LOGGING <br /> 1 .0 GENERAL <br /> 1 . 1 Scope of Work <br /> 1 . 1 . 1 The work included in this section covers the work, materials, labor <br /> and equipment necessary for geophysical logging and video <br /> surveying the production wells . <br /> 2 .0 PRODUCTS <br /> 2 . 1 Personnel <br /> 2 . 1 . 1 The CONTRACTOR shall furnish the services of an approved <br /> logging company to provide geophysical logs including a video <br /> survey. At the time he submits his bid, the CONTRACTOR must <br /> provide (for ENGINEERS approval) the name and address of the <br /> logging company that he will use. <br /> 2 .2 Equipment <br /> 2 . 2 . 1 The CONTRACTOR shall provide all materials, labor, and <br /> equipment including pump(s), flow meter(s), piping, valves and <br /> appurtenances necessary for pumping the well during performance <br /> of the dynamic geophysical logs and video survey. <br /> 2 .2 .2 The setup for pumping a well during the dynamic geophysical <br /> logging and video surveying shall be in accordance with Section <br /> 02200 PUMPING TEST. <br /> 3.0 EXECUTION <br /> 3 . 1 General <br /> 3 . 1 . 1 The CONTRACTOR shall retain full responsibility for notifying <br /> the logging crew , as nominated within his bid submittal , of the <br /> need to conduct the geophysical logging, water sampling and video <br /> surveying. <br /> 3 . 1 . 2 Prior to each geophysical logging, the CONTRACTOR shall <br /> prepare the hole to ensure that it is open and can be logged and/or <br /> surveyed with a minimum of delay. During the video survey <br /> clarity of the water shall be such that the video image has good <br /> GEOPHYSICAL LOGGING <br /> 02150- 1 <br /> C-\DOCUME- I \mikeh\LOCALS- I \Temp\Temporary Directory 18 for IRC wells Div I .zip\09-TRC_Logging.doc <br /> 10/ 17107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.