Laserfiche WebLink
SECTION 02150 <br /> GEOPHYSICAL LOGGING <br /> 1 .0 GENERAL <br /> 1 . 1 Scope of Work <br /> 1 . 1 . 1 The work included in this section covers the work, materials, labor <br /> and equipment necessary for geophysical logging and video <br /> surveying the production wells . <br /> 2 .0 PRODUCTS <br /> 2 . 1 Personnel <br /> 2 . 1 . 1 The CONTRACTOR shall furnish the services of an approved <br /> logging company to provide geophysical logs including a video <br /> survey. At the time he submits his bid, the CONTRACTOR must <br /> provide (for ENGINEERS approval) the name and address of the <br /> logging company that he will use. <br /> 2 .2 Equipment <br /> 2 . 2 . 1 The CONTRACTOR shall provide all materials, labor, and <br /> equipment including pump(s), flow meter(s), piping, valves and <br /> appurtenances necessary for pumping the well during performance <br /> of the dynamic geophysical logs and video survey. <br /> 2 .2 .2 The setup for pumping a well during the dynamic geophysical <br /> logging and video surveying shall be in accordance with Section <br /> 02200 PUMPING TEST. <br /> 3.0 EXECUTION <br /> 3 . 1 General <br /> 3 . 1 . 1 The CONTRACTOR shall retain full responsibility for notifying <br /> the logging crew , as nominated within his bid submittal , of the <br /> need to conduct the geophysical logging, water sampling and video <br /> surveying. <br /> 3 . 1 . 2 Prior to each geophysical logging, the CONTRACTOR shall <br /> prepare the hole to ensure that it is open and can be logged and/or <br /> surveyed with a minimum of delay. During the video survey <br /> clarity of the water shall be such that the video image has good <br /> GEOPHYSICAL LOGGING <br /> 02150- 1 <br /> C-\DOCUME- I \mikeh\LOCALS- I \Temp\Temporary Directory 18 for IRC wells Div I .zip\09-TRC_Logging.doc <br /> 10/ 17107 <br />