Laserfiche WebLink
7 .4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br /> Contract Documents with respect to existing underground facilities at or contiguous to the site and <br /> assumes responsibility for the accurate location of said underground facilities. No additional <br /> examinations, investigations, explorations, tests, reports, studies or similar information or data in <br /> respect of said underground facilities are or will be required by CONTRACTOR in order to <br /> perform and famish the work at the Contract Price, within the Contract Time and in accordance <br /> with the other terms and conditions of the Contract Documents, including specifically the <br /> provisions of Paragraph 4.04 of the General Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, <br /> explorations, tests, reports and studies with the terms and conditions of the Contract Documents. <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that <br /> he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is <br /> acceptable to CONTRACTOR. <br /> ARTICLE 8 CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR <br /> concerning the work consist of the following: <br /> 8 . 1 This Agreement (Section 00530). <br /> 8.2 Performance and Payment Bonds (Sections 00610 and 00612). <br /> 8.3 Notice of Award and Notice to Proceed (examples in Section 00800) . <br /> 8.4 General Conditions (Section 00700). <br /> 8. 5 Supplementary Conditions (Section 00800) . <br /> 8. 6 Specifications bearing the title "Public Supply Wells Construction and Testing" as listed in the table <br /> of contents hereof. <br /> 8 .7 Drawings, inclusive with each sheet bearing the following general title: "Public Supply Wells <br /> Construction and Testing". Only two drawings are included with this project and they are contained <br /> in the Specifications listed in item 8. 6 above. <br /> 8. 8 Addenda numbers-----L— to 4 inclusive. <br /> 8 .9 CONTRACTOR'S Bid (Section 00300). <br /> 8. 10 Specifications bearing the title "iRMI1S Water and Wastewater 1 ltil ,ty Standards, September <br /> 20041, or the latest version thereof <br /> 8. 11 The following, which may be delivered or issued after the effective date of the Agreement and are <br /> not attached hereto : All written amendments and other documents amending, modifying, or <br /> supplementing the Contract Documents pursuant to Paragraphs 3 .04 of the General Conditions. <br /> There are no Contract Documents other than those listed above in this Article 8 . The Contract Documents <br /> may only be amended, modified or supplemented as provided in Paragraphs 3 .04 of the General Conditions. <br /> 670643015- 155\8/30/07 00530-4 VRB <br />