submittals, processing Applications for Payment, and
<br /> maintaining required records. 3 .02 Reference Standards
<br /> 2 .07 Initial Acceptance of Schedules A . Standards, Specifications, Codes, Laws, and
<br /> Regulations
<br /> A. At least 10 days before submission of the first
<br /> Application for Payment a conference attended by I . Reference to standards, specifications, manuals,
<br /> Contractor, Engineer, and others as appropriate will be or codes of any technical society, organization, or
<br /> held to review for acceptability to Engineer as provided association, or to Laws or Regulations, whether such
<br /> below the schedules submitted in accordance with reference be specific or by implication, shall mean
<br /> Paragraph 2.05 .A. Contractor shall have an additional 10 the standard, specification, manual , code, or Laws or
<br /> days to make corrections and adjustments and to complete Regulations in effect at the time of opening of Bids
<br /> and resubmit the schedules. No progress payment shall be (or on the Effective Date of the Agreement if there
<br /> made to Contractor until acceptable schedules are were no Bids), except as may be otherwise
<br /> submitted to Engineer. specifically stated in the Contract Documents.
<br /> I . The Progress Schedule will be acceptable to 2 . No provision of any such standard, specification,
<br /> Engineer if it provides an orderly progression of the manual or code, or any instruction of a Supplier shall
<br /> Work to completion within the Contract Times. Such be effective to change the duties or responsibilities of
<br /> acceptance will not impose on Engineer responsibil - Owner, Contractor, or Engineer, or any of their
<br /> ity for the Progress Schedule, for sequencing, subcontractors, consultants, agents, or employees
<br /> scheduling, or progress of the Work nor interfere from those set forth in the Contract Documents. No
<br /> with or relieve Contractor from Contractor's full such provision or instruction shall be effective to
<br /> responsibility therefor. assign to Owner, or Engineer, or any of, their Related
<br /> Entities, any duty or authority to supervise or direct
<br /> 2. Contractor's Schedule of Submittals will be the performance of the Work or any duty or authority
<br /> acceptable to Engineer if it provides a workable to undertake responsibility inconsistent with the
<br /> arrangement for reviewing and processing the provisions of the Contract Documents.
<br /> required submittals.
<br /> 3 .03 Reporting and Resolving Discrepancies
<br /> 3. Contractor's Schedule of Values will be accept-
<br /> able to Engineer as to form and substance if it A. Reporting Discrepancies
<br /> provides a reasonable allocation of the Contract Price
<br /> to component parts of the Work. 1 . Contractor 's Review of Contract Documents
<br /> Before Starting Work: Before undertaking each part
<br /> of the Work, Contractor shall carefully study and
<br /> ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, compare the Contract Documents and check and
<br /> AMENDING , REUSE verify pertinent figures therein and all applicable
<br /> field measurements. Contractor shall promptly report
<br /> in writing to Engineer any conflict, error, ambiguity,
<br /> 3.01 Intent or discrepancy which Contractor may discover and
<br /> shall obtain a written interpretation or clarification
<br /> A. The Contract Documents are complementary; what is from Engineer before proceeding with any Work
<br /> required by one is as binding as if required by all . affected thereby.
<br /> B. It is the intent of the Contract Documents to describe a 2. Contractor ',s Review of Contract Documents
<br /> functionally complete Project (or part thereof) to be During Performance of Work: If, during the
<br /> constructed in accordance with the Contract Documents. performance of the Work, Contractor discovers any
<br /> Any labor, documentation, services, materials, or equip- conflict, error, ambiguity, or discrepancy within the
<br /> ment that may reasonably be inferred from the Contract Contract Documents or between the Contract Docu-
<br /> Documents or from prevailing custom or trade usage as ments and any provision of any Law or Regulation
<br /> being required to produce the intended result will be applicable to the performance of the Work or of any
<br /> provided whether or not specifically called for at no standard, specification, manual or code, or of any
<br /> additional cost to Owner. instruction of any Supplier, Contractor shall promptly
<br /> report it to Engineer in writing. Contractor shall not
<br /> C. Clarifications and interpretations of the Contract proceed with the Work affected thereby (except in an
<br /> Documents shall be issued by Engineer as provided in emergency as required by Paragraph 6. 16.A) until an
<br /> Article 9. amendment or supplement to the Contract
<br /> Documents has been issued by one of the methods
<br /> indicated in Paragraph 3 .04.
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright ® 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 00700 - 10