submittals, processing Applications for Payment, and <br /> maintaining required records. 3 .02 Reference Standards <br /> 2 .07 Initial Acceptance of Schedules A . Standards, Specifications, Codes, Laws, and <br /> Regulations <br /> A. At least 10 days before submission of the first <br /> Application for Payment a conference attended by I . Reference to standards, specifications, manuals, <br /> Contractor, Engineer, and others as appropriate will be or codes of any technical society, organization, or <br /> held to review for acceptability to Engineer as provided association, or to Laws or Regulations, whether such <br /> below the schedules submitted in accordance with reference be specific or by implication, shall mean <br /> Paragraph 2.05 .A. Contractor shall have an additional 10 the standard, specification, manual , code, or Laws or <br /> days to make corrections and adjustments and to complete Regulations in effect at the time of opening of Bids <br /> and resubmit the schedules. No progress payment shall be (or on the Effective Date of the Agreement if there <br /> made to Contractor until acceptable schedules are were no Bids), except as may be otherwise <br /> submitted to Engineer. specifically stated in the Contract Documents. <br /> I . The Progress Schedule will be acceptable to 2 . No provision of any such standard, specification, <br /> Engineer if it provides an orderly progression of the manual or code, or any instruction of a Supplier shall <br /> Work to completion within the Contract Times. Such be effective to change the duties or responsibilities of <br /> acceptance will not impose on Engineer responsibil - Owner, Contractor, or Engineer, or any of their <br /> ity for the Progress Schedule, for sequencing, subcontractors, consultants, agents, or employees <br /> scheduling, or progress of the Work nor interfere from those set forth in the Contract Documents. No <br /> with or relieve Contractor from Contractor's full such provision or instruction shall be effective to <br /> responsibility therefor. assign to Owner, or Engineer, or any of, their Related <br /> Entities, any duty or authority to supervise or direct <br /> 2. Contractor's Schedule of Submittals will be the performance of the Work or any duty or authority <br /> acceptable to Engineer if it provides a workable to undertake responsibility inconsistent with the <br /> arrangement for reviewing and processing the provisions of the Contract Documents. <br /> required submittals. <br /> 3 .03 Reporting and Resolving Discrepancies <br /> 3. Contractor's Schedule of Values will be accept- <br /> able to Engineer as to form and substance if it A. Reporting Discrepancies <br /> provides a reasonable allocation of the Contract Price <br /> to component parts of the Work. 1 . Contractor 's Review of Contract Documents <br /> Before Starting Work: Before undertaking each part <br /> of the Work, Contractor shall carefully study and <br /> ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, compare the Contract Documents and check and <br /> AMENDING , REUSE verify pertinent figures therein and all applicable <br /> field measurements. Contractor shall promptly report <br /> in writing to Engineer any conflict, error, ambiguity, <br /> 3.01 Intent or discrepancy which Contractor may discover and <br /> shall obtain a written interpretation or clarification <br /> A. The Contract Documents are complementary; what is from Engineer before proceeding with any Work <br /> required by one is as binding as if required by all . affected thereby. <br /> B. It is the intent of the Contract Documents to describe a 2. Contractor ',s Review of Contract Documents <br /> functionally complete Project (or part thereof) to be During Performance of Work: If, during the <br /> constructed in accordance with the Contract Documents. performance of the Work, Contractor discovers any <br /> Any labor, documentation, services, materials, or equip- conflict, error, ambiguity, or discrepancy within the <br /> ment that may reasonably be inferred from the Contract Contract Documents or between the Contract Docu- <br /> Documents or from prevailing custom or trade usage as ments and any provision of any Law or Regulation <br /> being required to produce the intended result will be applicable to the performance of the Work or of any <br /> provided whether or not specifically called for at no standard, specification, manual or code, or of any <br /> additional cost to Owner. instruction of any Supplier, Contractor shall promptly <br /> report it to Engineer in writing. Contractor shall not <br /> C. Clarifications and interpretations of the Contract proceed with the Work affected thereby (except in an <br /> Documents shall be issued by Engineer as provided in emergency as required by Paragraph 6. 16.A) until an <br /> Article 9. amendment or supplement to the Contract <br /> Documents has been issued by one of the methods <br /> indicated in Paragraph 3 .04. <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright ® 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 10 <br />