indirectly, in whole or in part, by Contractor, any Subcon- 1 . Shop Drawings
<br /> tractor, Supplier, or any other individual or entity directly
<br /> or indirectly employed by any of them to perform any of a. Submit number of copies specified in the
<br /> the Work, or anyone for whose acts any of them may be General Requirements.
<br /> liable, shall be remedied by Contractor (except damage or
<br /> loss attributable to the fault of Drawings or Specifications b. Data shown on the Shop Drawings will be
<br /> or to the acts or omissions of Owner or Engineer or , or complete with respect to quantities, dimensions,
<br /> anyone employed by any of them, or anyone for whose specified performance and design criteria,
<br /> acts any of them may be liable, and not attributable, materials, and similar data to show Engineer the
<br /> directly ,or indirectly, in whole or in part, to the fault or services, materials, and equipment Contractor
<br /> negligence of Contractor or any Subcontractor, Supplier, proposes to provide and to enable Engineer to
<br /> or other individual or entity directly or indirectly em- review the information for the limited purposes
<br /> ployed by any of them). required by Paragraph 6 . 17. D.
<br /> D. Contractor' s duties and responsibilities for safety and 2. Samples: Contractor shall also submit Samples to
<br /> for protection of the Work shall continue until such time Engineer for review and approval in accordance with
<br /> as all the Work is completed and Engineer has issued a the acceptable schedule of Shop Drawings and
<br /> notice to Owner and Contractor in accordance with Sample submittals.
<br /> Paragraph 14.07.B that the Work is acceptable (except as
<br /> otherwise expressly provided in connection with a. Submit number of Samples specified in the
<br /> Substantial Completion). Specifications.
<br /> 6. 14 Safety Representative b. Clearly identify each Sample as to material,
<br /> Supplier, pertinent data such as catalog numbers,
<br /> A. Contractor shall designate a qualified and experienced the use for which intended and other data as
<br /> safety representative at the Site whose duties and Engineer may require to enable Engineer to
<br /> responsibilities shall be the prevention of accidents and review the submittal for the limited purposes
<br /> the maintaining and supervising of safety precautions and required by Paragraph 6. 17 . D.
<br /> programs.
<br /> B. Where a Shop Drawing or Sample is required by the
<br /> 6. 15 Hazard Communication Programs Contract Documents or the Schedule of Submittals, any
<br /> related Work performed prior to Engineer's review and
<br /> A. Contractor shall be responsible for coordinating any approval of the pertinent submittal will be at the sole
<br /> exchange of material safety data sheets or other hazard expense and responsibility of Contractor.
<br /> communication information required to be made available
<br /> to or exchanged between or among employers at the Site C. Submittal Procedures
<br /> in accordance with Laws or Regulations.
<br /> 1 . Before submitting each Shop Drawing or
<br /> 6. 16 Emergencies Sample, Contractor shall have determined and veri-
<br /> fied:
<br /> A. In emergencies affecting the safety or protection of
<br /> persons or the Work or property at the Site or adjacent a. all field measurements, quantities, dimen-
<br /> thereto, Contractor is obligated to act to prevent sions, specified performance and design criteria,
<br /> threatened damage, injury, or loss. Contractor shall give installation requirements, materials, catalog
<br /> Engineer prompt written notice if Contractor believes that numbers, and similar information with respect
<br /> any significant changes in the Work or variations from the thereto;
<br /> Contract Documents have been caused thereby or are
<br /> required as a result thereof. If Engineer determines that a b. the suitability of all materials with respect to
<br /> change in the Contract Documents is required because of intended use, fabrication, shipping, handling,
<br /> the action taken by Contractor in response to such an storage, assembly, and installation pertaining to
<br /> emergency, a Work Change Directive or Change Order the performance of the Work ;
<br /> will be issued.
<br /> c. all information relative to Contractor's
<br /> 6. 17 Shop Drawings and Samples responsibilities for means, methods, techniques,
<br /> sequences, and procedures of construction, and
<br /> A. Contractor shall submit Shop Drawings and Samples safety precautions and programs incident thereto;
<br /> to Engineer for review and approval in accordance with and
<br /> the acceptable Schedule of Submittals (as required by
<br /> Paragraph 2.07). Each submittal will be identified as d. shall also have reviewed and coordinated each
<br /> Engineer may require. Shop Drawing or Sample with other Shop
<br /> Drawings and Samples and with the
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright ® 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 00700 - 23
<br />
|