My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Contractor shall afford each other contractor who is a disruption costs incurred by Contractor as a result of the <br /> party to such a direct contract, each utility owner and other contractor's actions or inactions. <br /> Owner, if Owner is performing other work with Owner' s <br /> employees, proper and safe access to the Site, a reason- C . Contractor shall be liable to Owner and any other <br /> able opportunity for the introduction and storage of contractor for the reasonable direct delay and disruption <br /> materials and equipment and the execution of such other costs incurred by such other contractor as a result of <br /> work, and shall properly coordinate the Work with theirs. Contractor's action or inactions. <br /> Contractor shall do all cutting, fitting, and patching of the <br /> Work that may be required to properly connect or <br /> otherwise make its several parts come together and ARTICLE 8 - OWNER ' S RESPONSIBILITIES <br /> properly integrate with such other work. Contractor shall <br /> not endanger any work of others by cutting, excavating, <br /> or otherwise altering their work and will only cut or alter 8 .01 Communications to Contractor <br /> their work with the written consent of Engineer and the <br /> others whose work will be affected. The duties and A. Except as otherwise provided in these General Condi- <br /> responsibilities of Contractor under this Paragraph are for tions, Owner shall issue all communications to Contractor <br /> the benefit of such utility owners and other contractors to through Engineer. <br /> the extent that there are comparable provisions for the <br /> benefit of Contractor in said direct contracts between 8 .02 Replacement of Engineer <br /> Owner and such utility owners and other contractors. <br /> A. In case of termination of the employment of Engineer, <br /> C. If the proper execution or results of any part of Owner shall appoint an engineer to whom Contractor <br /> Contractor's Work depends upon work performed by makes no reasonable objection, whose status under the <br /> others under this Article 7, Contractor shall inspect such Contract Documents shall be that of the former Engineer. <br /> other work and promptly report to Engineer in writing any <br /> delays, defects, or deficiencies in such other work that 8.03 Furnish Data <br /> render it unavailable or unsuitable for the proper <br /> execution and results of Contractor's Work. Contractor's A . Owner shall promptly furnish the data required of <br /> failure to so report will constitute an acceptance of such Owner under the Contract Documents. <br /> other work as fit and proper for integration with <br /> Contractor's Work except for latent defects and 8 .04 Pay When Due <br /> deficiencies in such other work. <br /> A . Owner shall make payments to Contractor when they <br /> 7.02 Coordination are due as provided in Paragraphs 14.02.0 and 14.07.C. <br /> A . If Owner intends to contract with others for the 8 .05 Lands and Easements; Reports and Tests <br /> performance of other work on the Project at the Site, the <br /> following will be set forth in Supplementary Conditions: A. Owner's duties in respect of providing lands and <br /> easements and providing engineering surveys to establish <br /> I . the individual or entity who will have authority reference points are set forth in Paragraphs 4.01 and 4.05 . <br /> and responsibility for coordination of the activities Paragraph 4.02 refers to Owner's identifying and making <br /> among the various contractors will be identified; available to Contractor copies of reports of explorations <br /> and tests of subsurface conditions and drawings of <br /> 2. the specific matters to be covered by such physical conditions in or relating to existing surface or <br /> authority and responsibility will be itemized; and subsurface structures at or contiguous to the Site that have <br /> been utilized by Engineer in preparing the Contract <br /> 3 . the extent of such authority and responsibilities Documents. <br /> will be provided. <br /> B. Unless otherwise provided in the Supplementary 8 .06 lnsurance <br /> Conditions, Owner shall have sole authority and respon- A. Owner's responsibilities, if any, in respect to pur- <br /> sibility for such coordination . chasing and maintaining liability and property insurance <br /> 7 .03 Legal Relationships are set forth in Article 5 . <br /> A. Paragraphs 7.OI .A and 7.02 are not applicable for 8.07 Change Orders <br /> utilities not under the control of Owner. A . Owner is obligated to execute Change Orders as <br /> B. Each other direct contract of Owner under Paragraph indicated in Paragraph 10.03 . <br /> 7.01 -A shall provide that the other contractor is liable to <br /> Owner and Contractor for the reasonable direct delay and <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright ® 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.