Subcontractor and Contractor will each be paid a C. If Contractor is delayed in the performance or progress <br /> fee of five percent of the amount paid to the next of the Work by fire, flood, epidemic , abnormal weather <br /> lower tier Subcontractor; conditions, acts of God, acts or failures to act of utility <br /> owners not under the control of Owner, or other causes <br /> d. no fee shall be payable on the basis of costs not the fault of and beyond control of Owner and <br /> itemized under Paragraphs I LOLAA, 11 .01 . A . 5, Contractor, then Contractor shall be entitled to an <br /> and 11 .01 . 0; equitable adjustment in Contract Times, if such <br /> adjustment is essential to Contractor's ability to complete <br /> e. the amount of credit to be allowed by the Work within the Contract Times. Such an adjustment <br /> Contractor to Owner for any change which shall be Contractor's sole and exclusive remedy for the <br /> results in a net decrease in cost will be the delays described in this Paragraph I2.03 .C . <br /> amount of the actual net decrease in cost plus a <br /> deduction in Contractor's fee by an amount equal D. Owner, Engineer and the Related Entities of each of <br /> to five percent of such net decrease; and them shall not be liable to Contractor for any claims, <br /> costs, losses, or damages (including but not limited to all <br /> f. when both additions and credits are involved fees and charges of Engineers, architects, attorneys, and <br /> in any one change, the adjustment in other professionals and all court or arbitration or other <br /> Contractor's fee shall be computed on the basis dispute resolution costs) sustained by Contractor on or in <br /> of the net change in accordance with Paragraphs connection with any other project or anticipated project. <br /> 12.01 .C.2.a through 12.01 .C.2.e, inclusive. <br /> E. Contractor shall not be entitled to an adjustment in <br /> 12.02 Change of Contract Times Contract Price or Contract Times for delays within the <br /> control of Contractor. Delays attributable to and within <br /> A. The Contract Times may only be changed by a Change the control of a Subcontractor or Supplier shall be deemed <br /> Order. Any Claim for an adjustment in the Contract to be delays within the control of Contractor. <br /> Times shall be based on written notice submitted by the <br /> party making the Claim to the Engineer and the other <br /> party to the Contract in accordance with the provisions of ARTICLE 13 - TESTS AND INSPECTIONS; <br /> Paragraph 10.05. CORRECTION , REMOVAL OR ACCEPTANCE OF <br /> DEFECTIVE WORK <br /> B. Any adjustment of the Contract Times covered by a <br /> Change Order or any Claim for an adjustment in the <br /> Contract Times will be determined in accordance with the 13.01 Notice of Defects <br /> provisions of this Article 12. <br /> A. Prompt notice of all defective Work of which Owner <br /> 12.03 Delays or Engineer has actual knowledge will be given to <br /> Contractor. All defective Work may be rejected, <br /> A. Where Contractor is prevented from completing any corrected, or accepted as provided in this Article 13 . <br /> part of the Work within the Contract Times due to delay <br /> beyond the control of Contractor, the Contract Times will 13.02 Access to Work <br /> be extended in an amount equal to the time lost due to <br /> such delay if a Claim is made therefor as provided in A. Owner, Engineer, their consultants and other <br /> Paragraph 12.02.A. Delays beyond the control of representatives and personnel of Owner, independent <br /> Contractor shall include, but not be limited to, acts or testing laboratories, and governmental agencies with <br /> neglect by Owner, acts or neglect of utility owners or jurisdictional interests will have access to the Site and the <br /> other contractors performing other work as contemplated Work at reasonable times for their observation, <br /> by Article 7, fires, floods, epidemics, abnormal weather inspecting, and testing. Contractor shall provide them <br /> conditions, or acts of God. proper and safe conditions for such access and advise <br /> them of Contractor's Site safety procedures and programs <br /> B. If Owner, Engineer, or other contractors or utility so that they may comply therewith as applicable. <br /> owners performing other work for Owner as contemplated <br /> by Article 7, or anyone for whom Owner is responsible, 13.03 Tests and Inspections <br /> delays, disrupts, or interferes with the performance or <br /> progress of the Work, then Contractor shall be entitled to A. Contractor shall give Engineer timely notice of <br /> an equitable adjustment in the Contract Price or the readiness of the Work for all required inspections, tests, <br /> Contract Times , or both. Contractor's entitlement to an or approvals and shall cooperate with inspection and <br /> adjustment of the Contract Times is conditioned on such testing personnel to facilitate required inspections or tests. <br /> adjustment being essential to Contractor's ability to <br /> complete the Work within the Contract Times. B . Owner shall employ and pay for the services of an <br /> independent testing laboratory to perform all inspections, <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 33 <br />