SUPPLEMENTARY CONDITIONS <br /> PART I - AMENDMENTS TO GENERAL CONDITIONS <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract (EJCDC Document No. C-700, 2002 edition) and other provisions of the Contract <br /> Documents as indicated below. All provisions which are not so amended or supplemented remain in full <br /> force and effect. <br /> ARTICLE I - DEFINITIONS AND TERMINOLOGY <br /> SC- 1 . 01 A . 37 <br /> Delete paragraph 1 . 0I . A . 37 of the General Conditions in its entirety and replace with the following: <br /> 37 . RESIDENT PROJECT REPRESENTATIVE — An authorized representative of the OWNER assigned <br /> to observe the Work performed and materials furnished by the CONTRACTOR or such other person as <br /> may be appointed by the OWNER as OWNER ' S representative . The CONTRACTOR shall be notified in <br /> writing of the identity of this representative . <br /> ARTICLE 2 - PRELIMINARY MATTERS <br /> SC-2.01B . <br /> Delete paragraph 2 .01B of the General Conditions in its entirety and replace with the following : <br /> B . Before any Work at the site is started, Contractor shall deliver to Owner, with copies to Engineer, <br /> certificates of insurance, which Contractor is required to purchase and maintain in accordance with the <br /> requirements of the Contract Documents. <br /> SC 2 .03A <br /> Delete paragraph 2 .03A of the General Conditions in its entirety, and replace with the following: <br /> The Contract Times will commence to run on the day indicated in the Notice to Proceed . A Notice to <br /> Proceed may be given at any time within 60 days after the Effective Date of the Agreement. <br /> SC 2.05A1 Add the following immediately at the end of subparagraph 2 .05A1 : using the Critical Path <br /> Method (CPM) . <br /> SC 2 . 05A .4 Add new subparagraph 4 after the existing text of 2 . 05 of the General Conditions : <br /> 4. If this Project is an addition to an existing working plant, then the Contractor shall coordinate with <br /> the Owner on tie-ins. The Owner shall have final say on plant shut down times and duration to make tie- <br /> ins. <br /> ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, AMENDING , REUSE <br /> SC-3 . 01C <br /> 6706-43015 - 155\ 1 0/ 17/07 00800-3 V RB <br />