Laserfiche WebLink
SC 6 . 19A : Delete Paragraph 6 . 19A . of the General Conditions in its entirety and replace with the <br /> following: <br /> A. Contractor warrants and guarantees to Owner for one ( 1 ) year from the date of Final Completion that <br /> all Work will be in accordance with the Contract Documents and will not be defective ; provided, however, <br /> that manufacturer equipment warranties may be of a longer duration . <br /> SC -6 .20A <br /> Delete paragraph 6.20A of the General Conditions in its entirety. <br /> SC -6 .21E <br /> Delete paragraph 6.21 E of the General Conditions in its entirety and replace with the following: <br /> E . Contractor shall not be responsible for the adequacy of the performance criteria or design criteria <br /> required by or contained in the Contract Documents. <br /> ARTICLE 8 OWNER'S RESPONSIBILITIES <br /> SC- 8 .01 Delete paragraph 8 .01 of the General Conditions in its entirety and replace with the following: <br /> Except as otherwise provided in these General Conditions, OWNER shall issue all communications to <br /> CONTRACTOR through RESIDENT PROJECT REPRESENTATIVE <br /> SC-8 .02 Delete paragraph 8 .02 of the General Conditions in its entirety and replace with the following: <br /> If Owner terminates the employment of Engineer, Owner may appoint another engineer whose status under <br /> the Contract Documents shall be that of the former Engineer. <br /> SC- 8 . 04 Delete paragraph 8 .04 of the General Conditions in its entirety and replace with the following: <br /> Payments under this contract are governed by the Local Government Prompt Payment Act, Florida Statutes <br /> section 218 .70 et. seq. , <br /> SC-8 .06 <br /> Delete paragraph 8 .06 of the General Conditions in its entirety. <br /> SC-8 . 11 <br /> Delete paragraph 8 . 1 1 of the General Conditions in its entirety. <br /> ARTICLE 9 - ENGINEER 'S STATUS DURING CONSTRUCTION <br /> SC-9 . 0IA . Delete paragraph 9 .01A . in its entirety and replace with the following: <br /> The OWNER shall designate the OWNER ' S REPRESENTATIVES during the construction period . The <br /> duties and responsibilities and the limitations of authority of the ENGINEER as one of the OWNER ' S <br /> 6706-43015- 155\10/ 17/07 00800-9 V RB <br />