Laserfiche WebLink
ORIGINAL <br /> Cost Summery: <br /> Monthly Totals <br /> South Tower Site $ 3,796. 86 <br /> Simulcast Control Point $ 3 ,337. 63 <br /> North Tower Site $ 4, 109, 93 <br /> Fellsmere Tower Site $ 2.071 .43 <br /> Dispatch Equipment $ 3.803.66 <br /> Hobart Tower Site $ 1 . 076.67 <br /> Total Montly Maintenance for Sites: $ 18,196.18 <br /> Total Annual Maintenance: $218,364.16 <br /> Fuel Adjustment fee (adjusted annually) $ 450 .00 <br /> Total after Fuel AdjustmenUGRAND TOTAL $218,804. 16 <br /> The Consumer Price Index Southeast Urban Region of 2.3% has been added to each equipment line item. <br /> Page 3 of 3 <br />