Laserfiche WebLink
t ' <br /> TOTAL CONSTRUCTION COST ESTIMATE $ 1 ,595,214.75 <br /> Construction Stakeout $509000.00 <br /> Engineering $501000.00 <br /> Final Plat/Permanent Control Points $15,000.00 <br /> As-built Survey $15,000.00 <br /> TOTAL CONSTRUCTION COST ESTIMATE FOR BOND $1 ,7251214.75 <br /> ADD FOR PERFORMANCE BOND 15% $258,782.21 <br /> TOTAL PERFORMANCEBOND AMOUNT <br /> $1 ,983,996.96 <br /> PREPARED BY.MASTELLEK& MOLER, INC. <br /> cJn <br /> ' 1 . <br /> STEPHEN E. MOLER, P.E.. FLORIDA # 33193 <br /> VICE PRESIDENT <br />